Kribi port shipping means using Cameroon's deep-sea port on the Atlantic coast, about 35 km from the town of Kribi, where 16 m of water lets the largest container ships berth. The port is run by the Port Autonome de Kribi (PAK), with a container terminal (KCT) and a multipurpose terminal (KMT). This guide covers the terminals, depth and ship limits, the cargo each terminal takes, the BESC and customs steps at Kribi, and how we ship your cargo there from Dubai. We ship both from Dubai to Kribi and from Kribi to Dubai.
Kribi port at a glance
| Item | Detail |
|---|---|
| Official name | Port en eau profonde de Kribi (Mboro site, Lolabe) |
| Port authority | Port Autonome de Kribi (PAK) |
| UN/LOCODE | CMKBI |
| Position | About 02°43'N, 09°50'E, 35 km from Kribi town, Gulf of Guinea |
| Commercial operations since | March 2018 |
| Depth at the quays | 16 m |
| Access channel | Marked channel 200 m wide, turning circle 600 m across, sounded to -15 m |
| Container terminal | Kribi Conteneurs Terminal (KCT): 350 m Phase I quay plus 715 m Phase II quay opened 9 May 2025 |
| Multipurpose terminal | Kribi Multipurpose Terminal (KMT), run by ICTSI: 265 m quay (Phase I) |
| Container capacity | About 1 million TEU a year after Phase II, up from about 300,000 TEU |
| Largest ship so far | MSC Turkiye, 400 m long, about 24,000 TEU |
| 2025 traffic | 559 ship calls, about 16 million tonnes |
| 2025 containers | 348,289 TEU transshipped, 110,593 TEU full imports, 17,976 TEU full exports |
| Customs | Cameroon Customs, Sud II sector based at the port, declarations in CAMCIS |
| Cargo tracking note | BESC from the CNCC, submitted at least two days before the ship arrives |
| Shipping to Dubai | We also ship from Kribi to Jebel Ali, Khalifa Port or Sharjah. Dubai duty is 5% of CIF for most goods, plus 5% import VAT |
Where is Kribi port and why do big ships call there?
The deep-sea port sits at Mboro, in the Lolabe area, on Cameroon's south coast. The PAK port guide places it 35 km from the town of Kribi. Do not confuse it with the old Kienke river port in Kribi town, which has only 80 m of quay and takes small craft.
Depth is the point. The PAK gives 16 m of water at the foot of the quays. Douala, the country's main port, is a river port up a dredged channel, so it takes far smaller ships. Kribi is the only port in Cameroon where today's largest container ships can berth. On 8 May 2025 the MSC Turkiye, a 400 m ship of about 24,000 TEU, berthed at the new Phase II quay without any reduction manoeuvre.
That is why much of Kribi's container traffic is transshipment. In 2025 the port moved 348,289 TEU of transshipment boxes, against 110,593 TEU of full imports. Large ships drop boxes at Kribi, and feeders carry them on to Douala and other Gulf of Guinea ports.
Approach, pilots and working hours
- Ships enter through a buoyed channel 200 m wide into a turning basin 600 m across, sounded to -15 m. A south breakwater shelters the basin from the south-west swell.
- Pilotage is compulsory for ships carrying dangerous goods, among others. The pilot station and harbour master's office work 24 hours a day.
- The tidal range is small, with a maximum of about 1.7 m.
- Berths are given in order of arrival at the anchorage, subject to window agreements between lines and the terminal operators.
Which terminals does Kribi port have?
Kribi has two working terminals on one site, both under concession. The terminal on your booking depends on the cargo: containers go to KCT, and bulk, breakbulk, vehicles and project cargo go to KMT.
| Terminal | Operator | What it handles | Key figures |
|---|---|---|---|
| Kribi Conteneurs Terminal (KCT), Phase I | KCT: Cameroonian shareholders, Africa Global Logistics (AGL), CMA CGM and CHEC | Containers, transshipment, reefers | 350 m quay, 16 m draught; ships up to 335 m long, 50 m beam, 14.5 m draught under the 2020 berth rules |
| KCT Phase II | KCT | Containers for the largest ships | 715 m quay, 16 m depth, 51 ha platform, opened 9 May 2025 |
| Kribi Multipurpose Terminal (KMT) | ICTSI, commercial operations since October 2020 | Ro-ro, project and heavy-lift cargo, forest products, dry and liquid bulk, general cargo | 265 m quay at -16 m; ships up to 220 m and 60,000 dwt under the 2020 berth rules |
The vessel limits in the table come from the PAK's 2020 port guide, written before Phase II opened. The Phase II quay now takes much larger ships, so confirm the current limit for any unusual vessel with the line.
Container terminal equipment
The 2020 port guide listed two 61-tonne ship-to-shore cranes and five 41-tonne yard gantries at KCT, with weighbridges at the gates. A Gottwald mobile harbour crane joined in April 2021. It can lift two 20ft containers at once. For Phase II, AGL reported that two equipment ships delivered 5 ship-to-shore cranes, 2 yard gantries, 13 RTGs, 2 reach stackers and 3 empty handlers in September and October 2024. The full Phase II plan is 7 quay cranes, 25 yard gantries and 48 port tractors.
Multipurpose terminal facilities
At the start of operations, the multipurpose terminal had more than 4,000 m2 of warehouses, 12 ha of paved yard, mobile yard cranes and a weighbridge. The PAK lists ores, hydrocarbons, cereals, forest products, fishery products, coffee and cocoa among KMT cargo. ICTSI adds ro-ro, project and heavy-lift cargo and support for the oil and gas industry.
What cargo can you ship through Kribi port?
| Cargo from the UAE | Terminal | What to plan |
|---|---|---|
| General goods in 20ft and 40ft boxes | KCT | Final discharge port Kribi on the booking, BESC, clearing agent at Kribi |
| Chilled and frozen food | KCT reefer slots | Set temperature, health permits, fast clearance |
| Vehicles and machinery on wheels | KMT (ro-ro) or containers at KCT | Ro-ro sailing, vehicle documents, excise at clearance |
| Steel, pipes, construction materials | KMT as breakbulk, or flat racks at KCT | Lifting points, lashing, yard space |
| Heavy-lift and project cargo | KMT | Drawings, vessel gear or crane plan, road permits from the port |
| Dangerous goods (IMDG) | KCT or KMT | DG declaration to the harbour master, class limits, direct delivery |
| Bulk cargo | KMT | Discharge plan, receiver's trucks or storage |
The PAK has also signed an agreement (9 October 2026) with KOGT S.A. for an agro-industrial terminal on 9.20 ha with 102,000 tonnes of planned storage. Press reports give 2027 for a mineral terminal and 2028 for a hydrocarbons terminal in the third phase. Treat these as plans, not current services.
FCL and LCL shipping to Kribi port
Most cargo from Dubai reaches Kribi as FCL, in 20ft, 40ft or 40ft high cube boxes. Your container may arrive on a mother ship that discharges at Kribi, or be transshipped at a hub and fed in.
For LCL, the Cameroon cargo tracking rules matter. Since 1 December 2024 the CNCC no longer issues one group BESC for a consolidated box. Each consignee needs its own house bill of lading and its own BESC. If one consignee in the box is late, the others can wait too. For small shipments this can tip the choice toward a 20ft FCL. Our sea freight service books both FCL and LCL from the UAE, and we price both when the volume is borderline.
A simple rule: ask for Kribi as the final port of discharge only if your consignee and clearing agent are set up there. A box that lands at Kribi for a Douala consignee has to be fed on by sea or trucked, which adds a leg, cost and days.
Breakbulk, heavy-lift and project cargo at Kribi
Kribi's depth suits large breakbulk and heavy-lift ships that cannot reach Douala. ICTSI markets KMT for project and heavy-lift cargo, and the PAK port guide requires the ship's agent to declare heavy or exceptional packages to the harbour master and the terminal at least 48 hours before arrival.

When we plan project cargo from the UAE to Kribi, we work in this order:
- Collect drawings, weights, dimensions and centre of gravity for every piece.
- Choose the vessel: flat rack or open top on a container service, or breakbulk or heavy-lift tonnage to KMT.
- Check lifting: ship's gear, terminal cranes or a hired mobile crane, piece by piece.
- Send the heavy-package details to the line so the agent can declare them 48 hours before arrival.
- Plan the road leg out of the port with the consignee's haulier, including permits for oversized loads.
If a piece fits a 40ft flat rack by size and weight, a container service to KCT usually gives you more sailings. If it does not, the breakbulk sailing date drives the plan. Our guide to flat rack, open top and breakbulk cargo explains the options, and our break bulk and project cargo team handles the UAE side, from drawings to the quay.
Dangerous goods at Kribi: what the port rules say
Kribi accepts IMDG dangerous goods, with its own notice rules on top of the IMDG Code. The PAK port guide sets these out.
| Rule | What it means for you |
|---|---|
| DG declaration (IMO FAL Form 7) sent by the agent to the harbour master's DG office | Your UN numbers, classes and packing groups must be correct before the ship sails |
| DG manifest sent 24 hours before the cargo is put on the quay | Late or wrong data can stop discharge or loading |
| Classes 1 and 7 for civil use announced 3 weeks in advance | The goods are removed directly from the port, with no storage, so the consignee must be ready |
| Class 5.1 ammonium nitrate needs special approval from the PAK Director General to be stored in the terminals | Apply early, or plan direct delivery |
| Pilotage compulsory for ships carrying dangerous goods | Handled by the line, but it is one reason DG acceptance is checked per call |
For any DG booking you need the UN number, proper shipping name, class and packing group, a safety data sheet and a signed dangerous goods declaration. Packages must carry UN-approved packaging, marks and labels. Every carrier and hub on the route must accept the class. Our dangerous goods shipping team checks acceptance with the line before you commit to a sailing.
Customs at Kribi port: BESC, CAMCIS and documents
Cameroon's general import rules apply at Kribi as at Douala, so we keep this short and focus on what is specific to Kribi. Our Douala guide and our Cameroon route guide cover duty bands and permits in full.
What is specific to clearing at Kribi?
- The customs Sud II sector is based at the port, with its main office, Kribi Port I.
- The PAK and Cameroon Customs connected the port information system with CAMCIS, the customs system, so port and clearance steps run online.
- The PAK publishes procedure guides for collecting and delivering goods at Kribi, and for imports and exports to and from Chad and the Central African Republic through the port.
- Container status can be followed on the PAK's SMART PAK tracking app.
What is the BESC and when do you need it?
The BESC is Cameroon's electronic cargo tracking note, issued by the national shippers' council (CNCC). For imports by sea, submit it on besc.cncc.cm at least two days before the ship arrives. The CNCC validates it within 24 hours at most. A late BESC stays pending until the penalty is paid, and the cargo waits with it.
Which documents do you need?
| Document | Who provides it |
|---|---|
| Commercial invoice and packing list | Shipper in the UAE |
| Bill of lading (house bill per consignee for LCL) | Carrier or forwarder |
| BESC | Importer, or a CNCC-approved intermediary, using the bill of lading data |
| Certificate of origin | Shipper, through the UAE issuing body |
| Import declaration and any permits | Importer and clearing agent in Cameroon |
| DG declaration and SDS | Shipper, for IMDG cargo |
Duty follows the Central African common external tariff, with bands of 0%, 5%, 10%, 20% and 30%. VAT and, for some goods, excise are added at clearance. Check the rate for your goods code with the clearing agent before you ship.
We do not clear goods in Cameroon. We send the documents and BESC data to the consignee's clearing agent at Kribi, or to an agent they choose, before the ship arrives.
Getting cargo out of Kribi: roads, rail and the hinterland
The quay is only half the trip. Plan the inland leg before you choose Kribi.
| Link | Status |
|---|---|
| Kribi-Lolabe highway | In service: 38.5 km of highway plus 4.9 km of connecting roads, serving the port and its industrial zone |
| Edea-Kribi road | Main road link north toward Edea and Douala; reported in poor condition, with rehabilitation requested |
| Railway | No rail link yet; a framework agreement for an Edea-Kribi-Lolabe-Campo line was signed on 4 June 2026 |
| Trucking corridors | MSC lists trucking from Kribi to Yaounde, N'Djamena (Chad) and Bangui (Central African Republic) |
| Sea feeder | Feeder services link Kribi with Douala and other Gulf of Guinea ports |
A simple rule: Kribi fits consignees in the south, around Yaounde, in the port's industrial zone, or cargo that arrives on a big ship calling Kribi directly. For consignees in Douala, the west or the north, compare Kribi plus a feeder or truck with a direct Douala discharge.
Shipping from Dubai to Kribi: lines, routings and transit
There is no direct UAE to Kribi service in the schedule data we opened. Cargo moves through one or more transshipment hubs. Carrier figures give a range:
| Source | Routing | Published transit |
|---|---|---|
| Maersk transit time sheet (April 2020) | Jebel Ali to Kribi | 45 days |
| Maersk transit time sheet (April 2020) | Dubai to Kribi | 47 days |
| Fluent Cargo schedule data | Fujairah to Kribi, COSCO, 2 transfers, every 1-2 weeks | 52 days 1 hour |
The Maersk figures are from 2020, so treat them as a guide only. MSC said in May 2026 that it runs four services calling Kribi: the Africa Express and the India Africa Service (IAS), plus the Douala Express Feeder and the Gulf of Guinea Feeder Service. Schedule sites also show CMA CGM, Hapag-Lloyd, Maersk and OOCL calls. The UAE end is usually Jebel Ali port.
[AMIR-FACT: our typical port-to-port days from Jebel Ali to Kribi, the carriers we book and the transshipment hubs they use]
How to ship from Dubai to Kribi port, step by step
- Agree the Incoterm with your buyer, so both sides know who books freight, who applies for the BESC and who clears at Kribi.
- Confirm the goods code, duty band and any permit with the consignee's clearing agent at Kribi.
- Send us the cargo details: goods, HS codes, weight, volume or dimensions, and packing.
- We book space from Jebel Ali or another UAE port on a service with Kribi as the final discharge port. For DG, reefer or out-of-gauge cargo we get carrier acceptance first.
- We check the invoice, packing list, certificate of origin and bill of lading data so names, weights and codes match.
- We arrange trucking to the UAE port and the export declaration, then load and seal the container.
- After sailing we send the bill of lading data for the BESC, which must go in at least two days before arrival.
- The clearing agent files in CAMCIS, duty and taxes are paid, and the box is released from KCT or KMT.
- The consignee's haulier collects the cargo and returns the empty within free time.

How to ship from Kribi port to Dubai
We also handle the other direction: shipping from Kribi to Dubai, with arrival at Jebel Ali, Khalifa Port or Sharjah port. We book the space with the carrier and run the UAE side. The Cameroonian export papers stay with the shipper or its Cameroonian agent.
The Cameroonian export side
- Single window. Export formalities run through the GUCE, the foreign trade single window that links customs, banks, the Treasury, SGS and the port authorities.
- Registration and origin. Exporters register with the Ministry of Trade, hold a taxpayer card, get authorisations for regulated goods and provide certificates of origin.
- Cocoa and timber. For cocoa, timber and medicinal plants, the exporter also submits a declaration through SGS.
- BESC. The shipper gets the cargo tracking note (BESC) from the Cameroon Shippers Council before loading and attaches it to the export customs documents.
The UAE import side
On arrival, the import declaration goes to Dubai Customs with the commercial invoice, packing list and certificate of origin, plus a permit from the relevant authority for restricted goods. The carrier releases the delivery order against the bill of lading. Customs duty in Dubai is 5% of the CIF value for most goods, with 50% on alcohol and 100% on cigarettes. Import VAT is 5% on top.
- Send us the shipper's details in Cameroon, the cargo, the HS code and the UAE delivery address.
- We book space to Jebel Ali, Khalifa Port or Sharjah and send the booking and cut-offs to the shipper.
- The shipper or its trucker delivers the cargo to KCT or KMT before the cut-off.
- The shipper or its Cameroonian agent completes the export formalities through the GUCE and gets the export BESC.
- We check the draft bill of lading against the invoice and packing list before it is issued.
- We file the UAE declaration with Dubai Customs before the ship arrives.
- We arrange payment of the duty and VAT and collect the delivery order from the carrier.
- We truck the cargo to your site in the UAE and return the empty container within free time.
[AMIR-FACT: the carriers we actually use from Kribi to Jebel Ali/Khalifa/Sharjah and our real transit days in this direction]
Free time, demurrage and storage at Kribi
Lines give free days on their containers, and the terminal gives free storage days. After that, demurrage, detention and storage charges run. They differ by line, terminal and container type, so read them on your quote and arrival notice. At Kribi, the BESC and CAMCIS steps are the usual cause of slow release, and a late BESC holds the box until the penalty is paid. Our article on demurrage and detention shows how the charges add up.
Checklist before you ship to Kribi
- Final discharge port on the booking is Kribi (CMKBI), not Douala, unless you chose Douala.
- Clearing agent at Kribi named and given the documents before arrival.
- BESC applicant agreed and given the bill of lading data on sailing.
- One house bill of lading and one BESC per consignee for LCL.
- Duty band and permits checked for every goods code.
- For DG: SDS, DG declaration, carrier and hub acceptance, and a plan for direct delivery where the class needs it.
- For heavy-lift: drawings and weights sent in time for the 48-hour heavy-package declaration.
- Inland transport booked from the port, with the road route checked for oversized loads.
- Free time known, with clearance planned before it ends.
- Cargo insurance in place, especially for project cargo and long transshipment routings.
Common mistakes when shipping to Kribi
| Mistake | What happens | How to avoid it |
|---|---|---|
| Booking Kribi for a Douala consignee | Extra feeder or truck leg and cost | Match the discharge port to where the consignee clears |
| Confusing the deep-sea port with the old Kienke port | Wrong address for trucks and paperwork | Use the port at Mboro, Lolabe, UN/LOCODE CMKBI |
| BESC submitted late | Cargo held until the penalty is paid | Submit at least two days before arrival |
| One BESC for an LCL box | Not accepted since 1 December 2024 | Separate house bill and BESC per consignee |
| Class 1 or 7 goods not announced | Goods refused or delayed | Give the port 3 weeks' notice and plan direct delivery |
| No inland plan | Storage charges while trucks are found | Book the haulier before the ship arrives |
Kribi or Douala: which port suits your cargo?
| Point | Kribi | Douala |
|---|---|---|
| Depth | 16 m at the quays | River port reached by a dredged channel, much shallower |
| Ships | Up to about 24,000 TEU | Smaller ships and feeders |
| Inland links | Highway to Lolabe, road to Edea, no rail yet | Rail and road links to the north of the country |
| Best for | South, Yaounde area, industrial zone, very large ships | Douala, the west and north, most clearing agents |
If you are unsure, send us the consignee's address and we will price both ports to the door.
Our bulk cargo service covers dry bulk moves where KMT is the receiving terminal.
Frequently asked questions
Who runs Kribi port?
The Port Autonome de Kribi (PAK) manages the port. Kribi Conteneurs Terminal (KCT), owned by Cameroonian shareholders, AGL, CMA CGM and CHEC, runs the container terminal. ICTSI runs the multipurpose terminal (KMT).
How deep is Kribi port?
The PAK gives 16 m of water at the quays, with a turning basin sounded to -15 m. That is deep enough for the MSC Turkiye, a 400 m ship of about 24,000 TEU, which berthed in May 2025.
What is the port code for Kribi?
The UN/LOCODE for Kribi is CMKBI. Use it on bookings and bills of lading so the cargo is not routed to Douala (CMDLA).
How much cargo does Kribi port handle?
PAK figures for 2025 show 559 ship calls and about 16 million tonnes. Containers included 348,289 TEU of transshipment, 110,593 TEU of full imports and 17,976 TEU of full exports.
How long does shipping from Dubai to Kribi take?
A 2020 Maersk transit sheet gave 45 days from Jebel Ali and 47 days from Dubai. Fluent Cargo schedule data shows 52 days from Fujairah with two transfers. Check current schedules at booking.
Do I need a BESC to ship to Kribi?
Yes, for sea imports into Cameroon. Submit it on the CNCC platform at least two days before the ship arrives. Validation takes up to 24 hours, and a late BESC stays pending until the penalty is paid.
Can Kribi port handle dangerous goods?
Yes. The agent declares IMDG cargo to the harbour master, and the DG manifest goes in 24 hours before the cargo reaches the quay. Classes 1 and 7 need 3 weeks' notice and direct removal from the port.
Is there a railway from Kribi port?
Not yet. Cargo leaves by road or by feeder ship. A framework agreement for an Edea-Kribi-Lolabe-Campo railway was signed on 4 June 2026.
Can I ship heavy-lift and project cargo to Kribi?
Yes. KMT handles project and heavy-lift cargo, ro-ro and breakbulk. The ship's agent must declare heavy or exceptional packages at least 48 hours before arrival.
Can you handle shipping from Kribi to Dubai?
Yes. We book the space from Kribi to Jebel Ali, Khalifa Port or Sharjah, file the Dubai Customs declaration and arrange payment of the 5% duty on the CIF value and the 5% import VAT. The shipper or its Cameroonian agent handles the export formalities through the GUCE at origin.
Get a quote for Kribi port shipping
Send us your cargo details and the consignee's address, and we will come back with a routing to Kribi and a price. Use our freight rate inquiry form, or contact our team about project, DG or LCL cargo. You can also read more about our Dubai freight forwarding team.
Sources
- Port Autonome de Kribi: key figures 2025 and agro-industrial terminal agreement
- Port Autonome de Kribi: Phase II in operation (9 May 2025)
- Port Autonome de Kribi: Guide du Port de Kribi (August 2020)
- Port Autonome de Kribi: cargo services (KCT and KMT)
- Port Autonome de Kribi: cargo procedures
- Port Autonome de Kribi: railway framework agreement (June 2026)
- Port Autonome de Kribi: newsletter 095, new mobile crane (April 2021)
- AGL: Kribi Conteneurs Terminal Phase II equipment
- ICTSI: Kribi Multipurpose Terminal
- Business in Cameroon: Kribi port triples capacity (May 2025)
- Business in Cameroon: Kribi port roads and rail link
- MSC via Africa.com: Kribi integration (May 2026)
- Cameroon Tribune: Kribi-Lolabe highway (September 2026)
- EcoMatin: customs at the port of Kribi and CAMCIS link
- CNCC: BESC
- CNCC: end of the group BESC from 1 December 2024
- US International Trade Administration: Cameroon import tariffs
- Maersk: Kribi import and export transit times (April 2020)
- Fluent Cargo: UAE to Cameroon schedules
- Linescape: Kribi port calls by carrier
- MarineLink: Kribi Deepwater Port (UN/LOCODE)
- US International Trade Administration: Cameroon customs regulations (export registration, GUCE, SGS declaration, export BESC)
- Dubai Customs: Submit customs declaration (invoice, packing list, certificate of origin, permits for restricted goods)
- Dubai Customs: FAQ (duty 5% of CIF value, 50% alcohol, 100% cigarettes)
- UAE Government portal: Clearing the customs and paying customs duty (5% of CIF)
- UAE Federal Tax Authority: VAT (5% rate)
Reviewed: 10 November 2026