Dhamra port shipping means moving bulk and breakbulk cargo through Dhamra Port in Odisha, a deep-draft private port run by Adani Ports that handles Capesize bulk carriers, subject to current berth and marine limits. It is built for coal, iron ore, limestone, steel, LPG and LNG, and it has no container terminal yet. This guide covers the berths, draft, cargo handling and customs, plus shipping from Dubai to Dhamra and shipping from Dhamra to Dubai.
Dhamra port at a glance
| Item | Detail |
|---|---|
| Location | North of the Dhamra river mouth, Bhadrak district, Odisha, between Haldia and Paradip on the Bay of Bengal |
| UN/LOCODE | INDMQ |
| Operator | The Dhamra Port Company Ltd (DPCL), a 100% subsidiary of Adani Ports and SEZ |
| Concession | Government of Odisha, build-own-operate-share-transfer, 34 years including 4 years of construction, signed April 1998 |
| First cargo ship | September 2010, coal cargo during trial operations |
| Adani ownership | Since June 2014 (before that a Larsen & Toubro and Tata Steel joint venture) |
| Permissible draft | Confirm the current monthly draft declaration and berth-specific acceptance with the port |
| Ship sizes | Capesize bulk carriers; acceptance depends on vessel dimensions, draft and allocated berth |
| Approach channel | Consult the current port information and monthly draft declaration for channel and berth limits |
| Phase 1 berths | Two 350 m mechanised berths |
| Installed capacity reported by Adani, October 2026 | 60 million tonnes a year |
| Cargo handled, FY2025-26 | 48.8 million tonnes |
| Rail | 62 km line to Bhadrak/Ranital on the Howrah-Chennai main line; confirm current rake capacity and track availability |
| Gas | LPG import berth and a 5 million tonne a year LNG import terminal |
| Containers | No container terminal; one is planned for phase 2 |
What is Dhamra port and who runs it?
Dhamra is a private, all-weather, deep-draft port built to feed the steel and power plants of eastern India. The Dhamra Port Company Ltd (DPCL) runs it under a concession from the Government of Odisha. DPCL started as a 50:50 joint venture of Larsen & Toubro and Tata Steel. Adani Ports bought it in 2014 and now owns 100%.
Adani describes the port as multi-user and multi-cargo, with direct berthing in all weather. Its hinterland is the mineral belt of Odisha, Jharkhand and West Bengal. That is why most of its traffic is coking coal coming in for steel plants, thermal coal for power and iron ore and steel going out.
Do not mix it up with Paradip, the major port further south on the same coast. Paradip has a container terminal and a wider spread of general cargo berths. Dhamra is a bulk specialist.
Berths, draft and ship size at Dhamra
Depth is Dhamra's main selling point. The operator describes facilities for Capesize bulk carriers. Obtain the current permitted draft and vessel limits for the allocated berth before fixing a ship. Phase 1 built two mechanised berths of 350 m each. The port has added berths since, and its live vessel schedule now shows these berth codes in use.
| Berth code | Schedule snapshot checked 15 November 2026 |
|---|---|
| B3AS, BB3 | Iron ore fines exports |
| BB3A | Dolomite imports |
| BB4 | Steel slab exports |
| BB5 | Limestone imports |
| DHS1 | Butane and propane imports and exports |
| LNGT | Listed vacant in this snapshot; an LNG arrival was expected on 16 November |
This is a dated operational snapshot, not a permanent berth allocation or availability guarantee. Check the live schedule and obtain terminal acceptance for each booking.
Channel depths and permitted vessel drafts are different measurements; tidal conditions and under-keel clearance also affect vessel acceptance. The berth your ship gets depends on the cargo, so confirm the berth and its current draft with the ship's local agent before you fix a vessel.
What cargo does Dhamra port handle?
Adani lists coal, limestone, iron ore and thermal coal as the core cargoes, plus steel, covered warehouse cargo and oversized and overweight project cargo. The following are equipment ratings, not guaranteed ship discharge rates.
| Side | Equipment | Rated capacity |
|---|---|---|
| Import | 5 grab ship unloaders | 2,800 tonnes an hour each |
| Import | 2 mobile harbour cranes (LHM 400) | 37 cubic metre grab |
| Import | 2 truck loading hoppers | 100 tonnes each |
| Import | 4 stacker reclaimers | Two at 5,500/3,500 and two at 7,500/3,500 tonnes an hour |
| Export | 1 ship loader | 5,000 tonnes an hour |
| Export | 2 wagon tipplers and 1 track hopper | 25 tipples an hour each; a full rake unloaded in 90 minutes |
| Rail loading | 4 rapid loading silos | Two at 2,000 and two at 4,000 tonnes an hour |
Storage is split by cargo:
| Storage area | Size |
|---|---|
| Mechanised coal yard | 113,024 sq m |
| Semi-mechanised coal and limestone yard | 184,083 sq m |
| Mechanised iron ore and thermal coal yard | 75,606 sq m |
| Covered warehouse | 33,750 sq m |
| Container and steel yard | 8,000 sq m |
A decision rule for bulk buyers: the grab unloaders are rated at 2,800 tonnes an hour each, but the achievable discharge rate depends on the cargo, vessel, equipment availability and operating conditions. Berth waiting time and rake availability for the inland leg are what to check when you agree laytime.
Does Dhamra port handle containers?
Not as a regular gateway. Adani's own port page says a container and general cargo terminal is planned for phase 2, along with a four-lane freight road. The port lists only an 8,000 sq m container and steel yard today. The operator's vessel schedule checked on 15 November 2026 shows bulk carriers and gas carriers and no container ships.
For liner containers, obtain a confirmed carrier service and terminal acceptance before considering Dhamra; otherwise compare established container gateways. Compare these options against current carrier schedules and terminal acceptance:
| Nearest container option | When it fits |
|---|---|
| Paradip | Consignee in Odisha; confirm current FCL service and terminal acceptance |
| Kolkata or Haldia | Consignee in West Bengal, Jharkhand or the north-east |
| Visakhapatnam | Consignee in Andhra Pradesh or south Odisha |
An old 2019 master plan spoke of up to 4.66 million TEU of container capacity at Dhamra. Treat that as a plan, not a service you can book today.
Shipping from Dubai to Dhamra: bulk, breakbulk and project cargo
Cargo from the UAE reaches Dhamra in bulk or breakbulk ships, not in liner containers. Use this table to pick the mode.
| Your cargo | Mode | What to check at Dhamra |
|---|---|---|
| Dry bulk such as limestone or other minerals, a full ship | Voyage charter of a bulk carrier | Berth draft, discharge rate, rake or truck evacuation |
| Dry bulk, part cargo | Part-cargo parcel on a bulk ship | Whether the ship's other parcels also discharge at Dhamra |
| Steel products, plates, coils | Breakbulk or multipurpose vessel | Space in the container and steel yard or covered warehouse |
| Oversized or heavy machinery | Project cargo on a multipurpose or heavy-lift ship | Lifting capacity at the berth and the road route out |
| Anything in containers | Container line | Confirm a container service and terminal acceptance at an alternative gateway |
On the UAE side, bulk usually loads at a dedicated bulk port rather than a container terminal. Our Saqr port guide covers one of the UAE's main bulk ports. Our dry and liquid bulk service plans the ship, the loading and the documents, and our break bulk and project cargo service covers steel and machinery.
Before fixing a vessel, confirm the cargo tonnage, stowage factor, berth acceptance, handling plan and inland evacuation arrangements with the ship operator and receiving terminal.

How to ship from Dhamra to Dubai
Shipping from Dhamra to Dubai means exporting bulk or breakbulk. The port's export side runs thermal coal, iron ore, pig iron and steel, loaded by a 5,000 tonne an hour ship loader for bulk. The schedule checked on 15 November 2026 shows iron ore fines and steel slabs going out. Steel and pig iron for the UAE usually suit a breakbulk or multipurpose ship. For containers, compare alternative gateways such as Paradip or Kolkata and confirm an available sailing.
| Step | Who does it | What to check |
|---|---|---|
| Plan the ship to the UAE | We book space or a part cargo with the ship operator | Discharge port: Jebel Ali, Khalifa or a bulk port such as Saqr |
| Bring cargo to Dhamra | Shipper or origin agent | Rakes or trucks timed to the laycan |
| Indian export filing | Shipper or its customs broker in India | Shipping Bill on ICEGATE with GSTIN and state code |
| Certificate of origin | Shipper, through DGFT's eCoO platform | Preferential CEPA certificate if the goods qualify |
| Loading and bill of lading | Port and ship operator | Quantity, marks and description match the invoice |
| UAE import clearance | We file with Dubai Customs or the relevant emirate's customs | Invoice, packing list, certificate of origin and any permit from a restriction entity |
| Delivery in the UAE | We arrange trucking or lifting | Low-bed trailers for heavy steel, site access |
For steel coils or plates landing at Jebel Ali, our Jebel Ali port guide covers the breakbulk berths and the UAE paperwork. Under India-UAE CEPA, DGFT has issued preferential certificates of origin for exports to the UAE on its eCoO platform since 1 May 2022, so ask the shipper for one if the goods qualify.
Rail and road links out of Dhamra port
Dhamra is a rail port first. Most bulk leaves by train, so the inland plan matters as much as the sea leg.
| Link | Detail |
|---|---|
| Rail line | 62 km from the port to Bhadrak/Ranital link cabin on the Howrah-Chennai main line, opened in May 2011; confirm current rake capacity and track availability |
| Rail model | First line under the Railways Infrastructure for Industry Initiative, a revenue-sharing model with Indian Railways |
| Rake handling | Merry-go-round system with rapid loading silos |
| Corridor | 125 m utilities corridor with room for two rail tracks, a four-lane road and service lines |
| Road | Road connection towards National Highway 16; the operator describes a planned four-lane freight corridor. Confirm the current route and heavy-cargo clearances. |
For a buyer inland, agree early who books the rakes and who pays if the cargo waits in the yard. Our article on demurrage and detention explains how waiting charges build up on ships and equipment.
LPG and LNG at Dhamra
Dhamra also runs gas berths. The vessel schedule shows LPG carriers discharging butane and propane at berth DHS1 and gas carriers listed under ship-to-ship operations. The Dhamra LNG terminal, owned by Adani Total, received its first cargo on 1 April 2023.
| LNG terminal item | Detail |
|---|---|
| Capacity | 5 million tonnes a year nominal, 6.5 million peak; expandable to 10 million |
| Storage | Two full-containment tanks of 180,000 cubic metres each |
| Jetty | For LNG carriers from 40,000 to 265,000 cubic metres, subject to terminal acceptance |
| Off-take | Pipeline connection to JHBDPL; designed for truck loading and reloading |
The LNG terminal offers regasification under short- and long-term bilateral agreements. Gas-tanker facilities do not establish acceptance for packaged dangerous goods.
Dangerous goods to Dhamra
For packaged dangerous goods in containers, confirm a carrier service and DG acceptance at a suitable container gateway, such as Paradip or Kolkata. If DG is part of a breakbulk or project shipment, for example batteries inside machinery or drums of chemicals on a multipurpose ship, the ship operator and the port must accept it before loading.
- Prepare the UN number, proper shipping name, class, packing group where applicable, an SDS and a signed DG declaration.
- Use packaging meeting the applicable IMDG requirements and stow to the IMDG Code.
- Check that the Indian importer holds any licence the product needs.
Our dangerous goods shipping team checks acceptance before you commit.
Customs at Dhamra: the short version
Customs rules at Dhamra are the same as at any Indian seaport. Our Nhava Sheva port guide covers Indian import clearance in full. These are the points that matter most for bulk.
| Rule | What it means for bulk at Dhamra |
|---|---|
| Importer needs an IEC | A 10-digit Import Export Code from DGFT, plus GSTIN and state code on the Bill of Entry for IGST credit |
| Bill of Entry timing | For sea imports consigned from the UAE, by the end of the day (including holidays) before arrival; filing is permitted up to 30 days ahead. Different deadlines apply to specified countries and other transport modes. |
| One entry for the bill of lading | The Bill of Entry must cover all goods on the bill of lading unless the officer allows otherwise |
| Documents | Uploaded on e-Sanchit as PDFs under 1 MB each before filing |
| CEPA preference | India-UAE CEPA has applied since 1 May 2022; the goods must meet the origin rule for their HS code |
Make sure the invoice, bill of lading and certificate of origin carry the same quantity and description. We work with your customs broker or a clearing agent at the port. We do not file Indian customs entries ourselves.

How to ship bulk or breakbulk from Dubai to Dhamra: step by step
- Share the cargo details. Commodity, HS code, tonnage, stowage factor, packing, Incoterm and the buyer's plant location.
- Confirm Dhamra fits. Bulk, steel or project cargo, not containers.
- Plan the ship. Full charter or part cargo, the load port in the UAE and the laycan.
- Agree laytime and demurrage terms that match Dhamra's discharge rate and the inland evacuation plan.
- Prepare the documents. Invoice, packing list or quality certificate, certificate of origin and draft bill of lading must match. Our breakbulk documents guide lists what the UAE side needs.
- Load and export from the UAE. We coordinate loading, lashing for breakbulk and the UAE export declaration.
- File in India. The importer's broker files the Bill of Entry before arrival.
- Discharge and evacuate. Draft survey, duty payment, release, then rail rakes or trucks to the plant.
For heavy or oversized pieces, our project cargo process guide walks through surveys, lift plans and route checks.
Checklist before you ship to Dhamra
- Cargo is bulk, breakbulk or project cargo. Containers go to another port.
- Importer has an active IEC, GSTIN and a broker at the port.
- Ship size and draft fit the berth you are allocated.
- Laytime, demurrage and discharge rate agreed in the contract.
- Rakes or trucks arranged for evacuation.
- Bill of Entry ready to file before arrival.
- CEPA certificate of origin arranged if the goods qualify.
- Cargo insurance covers the sea leg and the inland move.
Common mistakes on shipments to Dhamra
- Booking a container to Dhamra without confirming a liner service and terminal acceptance.
- Fixing a ship before checking the berth draft on the latest declaration.
- Agreeing laytime without a plan for rakes, so the cargo blocks the yard.
- Different quantities on the invoice, bill of lading and certificate of origin.
- Ignoring the weather. Cyclone Dana made landfall near the port on 24 to 25 October 2024, so build slack into October and November sailings.
Dhamra, Paradip or Kolkata: which east coast port fits?
| Your cargo | Port to consider first | Why |
|---|---|---|
| Cape-size coal, ore or limestone for plants in Odisha or Jharkhand | Dhamra | Deep-draft facilities, mechanised berths and a dedicated rail line |
| Containers for Odisha | Paradip | Check available container services and terminal acceptance |
| Containers for West Bengal or Jharkhand | Kolkata or Haldia | Container terminals and river access to Kolkata |
| Steel or project cargo for Odisha | Dhamra or Paradip | Compare berth availability and the road route to site |
Frequently asked questions
Who owns Dhamra port?
Adani Ports and SEZ owns 100% of The Dhamra Port Company Ltd, which runs the port under a 34-year concession from the Government of Odisha. Adani bought it in 2014 from a Larsen & Toubro and Tata Steel joint venture.
How deep is Dhamra port?
The operator describes facilities for Capesize bulk carriers. Obtain the current permitted draft and vessel limits for the allocated berth before fixing a ship. Use the port’s current monthly declaration rather than historical channel depths to plan arrival draft.
Can I ship containers to Dhamra port?
Not as a regular service. Adani lists the container terminal as a phase 2 plan, and the November 2026 vessel schedule shows no container ships. Compare Paradip for Odisha and Kolkata or Haldia for West Bengal, subject to current carrier service and terminal acceptance.
What cargo does Dhamra port handle?
Mainly coking coal, thermal coal, iron ore and limestone, plus pig iron, steel, project cargo, LPG and LNG. Adani reports that it handled 48.8 million tonnes in FY2025-26.
Can I ship cargo from Dhamra to Dubai?
Yes, as bulk or breakbulk. Dhamra exports thermal coal, iron ore, pig iron and steel. We book the space, then handle UAE customs clearance and delivery. For containers from Odisha, compare alternative gateways and confirm a current sailing before booking.
What is the UN/LOCODE of Dhamra port?
INDMQ. Use it on bookings and documents so the cargo is not confused with nearby Paradip.
Is Dhamra connected by rail?
Yes. A 62 km line links the port to Bhadrak on the Howrah-Chennai main line, with rapid loading silos and wagon tipplers at the port. Confirm current rake capacity and operating arrangements with the port.
Does Dhamra have an LNG terminal?
Yes. Adani Total's Dhamra LNG terminal took its first cargo on 1 April 2023. It has 5 million tonnes a year of capacity and two 180,000 cubic metre tanks.
Can I get lower duty on goods shipped from Dubai to Dhamra?
Only if the goods meet the India-UAE CEPA origin rule for their HS code and the importer presents the certificate of origin with the Bill of Entry. Goods only stored or re-exported through Dubai usually do not qualify.
Get a quote for Dhamra port shipping
Send us the cargo, tonnage and load port, and we will come back with a shipping plan and price from the UAE to Dhamra, or to a better-placed port if your cargo is in containers. Use our freight rate inquiry form, or contact our team to talk through a bulk or project shipment. You can also read more about our Dubai freight forwarding team.
Sources
Adani Dhamra: port information and monthly draft declaration
Indian Customs Public Notice 15/2021: Bill of Entry deadlines and country exceptions
Dhamra LNG operator: nominal and peak capacity, storage, vessel sizes and services
Adani, October 2026: Dhamra installed capacity and FY2025-26 throughput
- Dubai Customs: Submit customs declaration (import documents)
- Adani Ports: Dhamra Port (operator, concession, equipment, storage, rail, planned container terminal)
- Adani Ports: Dhamra vessel schedule, checked 15 November 2026 (berth codes, cargo)
- Ship Technology: Dhamra Port (18 m draft, 180,000 dwt, phase 2 capacity, road link)
- Wikipedia: Dhamra Port (history, channel depths, 2023-24 tonnage, rail line, cyclones)
- Maritime Gateway: Adani Ports' 2019 master plan for Dhamra
- Maritime Gateway: First LNG cargo at Dhamra, April 2023
- NS Energy: Dhamra LNG import terminal (tanks, jetty, off-take)
- MagicPort: Dhamra Port INDMQ (UN/LOCODE)
- CBIC: Customs Act, 1962 (Section 46)
- ICEGATE: FAQs (IEC, prior Bill of Entry, e-Sanchit, GSTIN)
- DGFT Trade Notice 05/2022-23: India-UAE CEPA from 1 May 2022
Reviewed: 15 November 2026