Skip to content

Kamarajar port shipping: Ennore terminals, cars, containers and how to ship from Dubai

Ennore container terminal — reference-grounded illustration
Ennore container terminal — reference-grounded illustration. Generated from photographic references; not an event photograph.

Kamarajar port shipping means moving cargo through Kamarajar Port at Ennore, the corporatised major port about 24 km north of Chennai, still widely known as Ennore Port. It has a container terminal run by Adani, two car and general cargo berths, coal, liquid and LNG terminals, and since July 2026 an 18 m operational draft. This guide explains which terminal your cargo will use, how Kamarajar differs from Chennai port, the short version of customs, and how we ship to Ennore from Dubai. We ship in both directions: from Dubai to Kamarajar port, and from Kamarajar port to Dubai with clearance in the UAE.

Kamarajar port at a glance

ItemDetail
Official nameKamarajar Port Limited (KPL)
Other namesEnnore Port (name until 2014)
UN/LOCODEINENR
LocationEnnore, Tamil Nadu, on the Coromandel Coast, about 24 km north of Chennai
StatusMajor port run as a company, a company of Chennai Port Authority, landlord model
Commissioned1 February 2001; commercial operations from 22 June 2001
AreaAbout 2,800 acres
HarbourMan-made, north breakwater about 3,080 m, south breakwater about 1,070 m
Operational draft18 m since Capital Dredging Phase VI (July 2026), ships up to 170,000 DWT
Handling capacity58.44 million tonnes a year
Cargo handled48.41 million tonnes in FY2024-25; 25.99 million tonnes from April to September 2026
Containers (AECT)681,124 TEU in FY2024-25; 380,093 TEU from April to September 2026
Main cargoThermal coal, containers, cars, petroleum products and LPG, LNG, steel and project cargo
Customs filingBill of Entry on ICEGATE, same rules as every Indian port
Kamarajar to DubaiShipping bill filed in India by the shipper or its broker; Dubai Customs declaration on arrival at Jebel Ali, Khalifa Port or Sharjah

What is Kamarajar port and how is it different from Chennai port?

Kamarajar Port was built as Ennore Port to take thermal coal away from the crowded city port of Chennai. It was declared a major port in March 1999, incorporated as Ennore Port Limited in October 1999 and commissioned on 1 February 2001. It was renamed Kamarajar Port in 2014. It is the first major port in India set up as a company, and today it is a company of Chennai Port Authority under the Ministry of Ports, Shipping and Waterways.

The port works as a landlord. KPL owns the harbour and the land, and private operators run most terminals. That is why your booking will name a terminal, such as AECT for containers, rather than just "Ennore".

Three ports serve the Chennai area, and shippers mix them up often. Here is how they differ for a UAE shipper.

PortWhereWhat it is best known forUse it when
Kamarajar (Ennore)About 24 km north of ChennaiCoal, containers at AECT, car exports, LNG and liquids, 18 m draftYour carrier calls AECT, you ship cars or large bulk ships, or your consignee is north of the city
Chennai portInside the cityTwo container terminals, the oldest port in the regionYour carrier calls one of the Chennai terminals
KattupalliNorth ChennaiAdani-run private portYour carrier's service calls Kattupalli

The carrier's service decides the port, not the city on your invoice. A container booked to "Chennai" may discharge at Ennore, and the clearing agent and the truck need to know that before the ship arrives.

Which terminals operate at Kamarajar port?

KPL lists eight terminals and berths. Depth is the water at the berth, and draft is the deepest a loaded ship may sit there.

TerminalLengthDraft / depthCapacityCargoOperator
Container terminal, Phase 1400 m quay15 m / 16.70 m0.8 million TEU, 1.4 million TEU plannedContainersAdani Ennore Container Terminal (AECT)
General Cargo Berth 2330 m14.50 m / 16 m3 million tonnes, about 300,000 cars a yearCars, machinery, general cargoKPL berth, opened January 2024
General Cargo Berth 1278 m10.00 m / 12 m3 million tonnesCars, general cargoKPL berth, opened 2012
Multi Cargo Terminal270 m14.50 m / 16 m2 million tonnesSteel, project cargo, fertilisers, grains, sandEnnore Bulk Terminal (JSW Group)
Common User Coal Terminal347.5 m16 m / 18 m11 million tonnesCoal, Capesize shipsEnnore Coal Terminal (JSW Group)
Coal Berths 1 and 2280 m14.50 m / 16 m16 million tonnesThermal coal for power stationsTopside facilities run by TANGEDCO
Marine Liquid Terminal360 m13.50 m / 15 m3 million tonnes, expandable to 6Petroleum products, LPG, chemicals, vegetable oilEnnore Tank Terminal
LNG terminalNot stated12.50 m / 15 m5 million tonnes, expandable to 10LNGIndian Oil LNG

For general cargo from the UAE, three of these matter: AECT for containers, the two general cargo berths for vehicles and machinery, and the JSW multi cargo terminal for steel and project pieces.

The container terminal at Ennore: AECT

Adani Ennore Container Terminal works under a design, build, finance, operate and transfer concession signed on 15 March 2014, and Phase 1 began in October 2017. It has a 400 m quay with 15 m draft and takes ships up to 366 m long. Adani lists four quay cranes with 65 m outreach, covering 22 rows across, twelve electric rubber-tyred gantries and 4,000 ground slots in the yard. In November 2020 the port handled MSC Faith, a 14,336 TEU ship, then the largest container ship to call there.

Three practical points for importers:

  • AECT has its own rail siding with links towards Bengaluru, so a box can move inland by rail without leaving the port by road first.
  • The terminal keeps separate areas for direct port delivery (DPD) and direct port entry (DPE) examinations, which matters if your consignee clears straight from the port.
  • Adani says about 60% of the area's container freight stations are close to the terminal, which keeps the CFS leg short if your box is not on DPD.

Cars and Ro-Ro at the general cargo berths

Ennore is a busy car export port. Car exports started in 2010-11, when Renault-Nissan shipped 54,264 cars. General Cargo Berth 2 opened in January 2024 with room for about 300,000 cars a year, and Toyota Kirloskar has extended its export agreement with the port to March 2035. On a vessels list we read in November 2026, a car carrier was working 700 units at GCB2.

For a UAE shipper, these berths mostly matter for inbound machinery, vehicles for special use, and project pieces that come on Ro-Ro or car carrier services. Car carrier calls are planned around Indian factory exports, so space for inbound units needs checking case by case.

Kamarajar vehicle export berth — reference-grounded illustration
Kamarajar vehicle export berth — reference-grounded illustration. Generated from photographic references; not an event photograph.

What does the 18 m draft change at Kamarajar port?

In July 2026 KPL finished Capital Dredging Phase VI, a project of about ₹440 crore. The outer approach channel went from 20 m to 23 m and the inner entrance channel from 19 m to 22 m, giving an 18 m operational draft. Kamarajar became India's second major port with an 18 m draft, after Visakhapatnam, and can now take cargo parcels of up to 170,000 DWT.

This matters mostly for bulk. Fully loaded Capesize ships with coal, limestone, fertiliser or iron ore can now come in without lightering. For containers, the limit is still the berth: AECT works to 15 m draft. If you charter a large bulk ship from the Gulf to south India, Ennore is now one of the few east coast ports that can take it fully loaded.

Shipping from Dubai to Kamarajar port: FCL, LCL and routing

Containers from Jebel Ali Port reach Ennore on carrier services that call AECT. AECT handled 681,124 TEU in FY2024-25 and 380,093 TEU in the first half of FY2026-27, so this is a busy terminal. Whether your box goes direct or is transhipped at a hub depends on the carrier's loop on the day you book.

[AMIR-FACT: Our real Jebel Ali to Ennore (AECT) transit time in days, whether the service is direct or via Colombo or another hub, and the carriers we book on this lane]

Your shipmentBest fitWhy
Enough cargo for a 20ft or 40ft boxFCL to AECTOne container, one Bill of Entry, rail or road onward
A few palletsLCL to the Chennai areaCheck whether the consolidator discharges at Ennore or Chennai
Machinery, vehicles, rolling equipmentRo-Ro or car carrier to GCB1 or GCB2No container needed, but inbound space varies
Steel or heavy piecesBreakbulk to the multi cargo terminal, or flat racks to AECTDepends on piece size and sailing options
Bulk shiploadCharter to the coal or multi cargo terminals18 m draft takes large ships fully loaded

Not sure whether FCL or LCL pays off for your volume? Our guide to FCL vs LCL shows the break-even. Our sea freight service books both from the UAE.

Breakbulk, bulk and project cargo at Ennore

The JSW-run multi cargo terminal takes steel, project cargo, fertilisers, grains and sand on a 270 m berth with 14.50 m draft. The coal terminals handle thermal coal for the power stations around Ennore, and the common user coal terminal can take Capesize ships.

For project cargo, the heaviest piece decides the plan:

  1. We collect the weight, dimensions and centre of gravity of every piece.
  2. We match the cargo to a ship: flat racks on a container service into AECT, a Ro-Ro call at the general cargo berths, or a breakbulk ship to the multi cargo terminal.
  3. We confirm with the carrier which berth and cranes will work the cargo at Ennore.
  4. The consignee's transporter checks the road route from the port to site.

See our break bulk shipping service for oversized pieces and our bulk cargo service for shiploads.

Dangerous goods at Kamarajar port

Ennore handles hazardous cargo every day. The marine liquid terminal takes petroleum products, LPG and chemicals, and the LNG terminal imports and regasifies LNG. On the vessels list we read, an LPG carrier was discharging 21,000 tonnes of propane and butane at the liquid terminal. Containerised DG moves through AECT like any other box, but the carrier and terminal must accept the UN number and class first.

  1. We send the safety data sheet, UN number, class and packing group to the carrier for approval.
  2. The shipper prepares the dangerous goods declaration, and the container gets the right IMDG labels and placards.
  3. The consignee's clearing agent checks whether the product needs an Indian licence or permit before sailing.
  4. The consignee plans fast clearance and pickup, because terminals limit how long DG boxes may stay.

Our dangerous goods shipping team handles classification checks, packing checks and carrier approval from the UAE.

Customs at Kamarajar port: the short version

Indian customs rules are the same at every port, and our Nhava Sheva port guide covers them in full. For Ennore you need to know this:

  • The importer needs an Import Export Code (IEC), the 10-digit number issued by DGFT.
  • The Bill of Entry is filed on ICEGATE. One filed before arrival stays valid if the ship arrives within 30 days.
  • Supporting documents go through e-Sanchit first. The Bill of Entry cannot be submitted until they are uploaded.
  • The Bill of Entry must show the importer's GSTIN and state code to claim IGST credit.
  • Deferred duty payment is open only to importers with AEO T-2 or T-3 status.

The Ennore-specific point is the port code. The bill of lading and the Bill of Entry must name Ennore (INENR) if the box discharges at AECT. A filing against Chennai port for a container that lands at Ennore means amendments and lost free time. Goods made in the UAE that meet the India-UAE CEPA origin rules may qualify for lower duty with a preferential certificate of origin. Goods only stored in or re-exported through Dubai usually do not.

We do not file Indian customs entries. We prepare the export side in the UAE and work with the consignee's customs broker or a destination clearing agent at Ennore.

Which documents should travel with an Ennore shipment?

DocumentWho provides itEnnore tip
Commercial invoiceShipper in the UAEValue and HS code must match the Bill of Entry
Packing listShipperPiece weights matter for Ro-Ro and breakbulk berths
Bill of ladingCarrier, via usPort of discharge must read Ennore (INENR), not Chennai or Colombo
Certificate of originUAE issuing authorityNeeded to claim CEPA preference
Dangerous goods declaration and SDSShipperFor any DG cargo, approved before booking
IEC, GSTIN and any licenceImporter in IndiaDeclared on the Bill of Entry
Indian port container rail logistics — generic illustration
Indian port container rail logistics — generic illustration. Generated from photographic references; not an event photograph.

How does cargo leave Kamarajar port?

Most cargo leaves by road. Adani describes access to four national highways and approach roads open around the clock. Rail is the second option. AECT's on-dock siding links towards Bengaluru, and in August 2026 CONCOR launched a rail container service from Ennore to ICD Sanathnagar in Hyderabad. CMA CGM has described Ennore as a natural gateway for the inland container depot at Bangalore.

Consignee locationUsual inland routeCheck before you ship
North Chennai, Ennore, Manali, ThiruvallurTruck from AECT or the berthsDelivery order and gate timing
Chennai city and the south and west industrial beltTruckCompare with discharge at Chennai port if your carrier offers it
Bengaluru and KarnatakaRail from AECT or truckWhether the Bill of Entry is filed at the port or at the inland depot
Hyderabad and TelanganaCONCOR rail to ICD Sanathnagar, or truckRail booking and free time on the container

How to ship from Dubai to Kamarajar port: step by step

  1. Send us the cargo details: commodity, HS code, weight, dimensions, number of pieces and the consignee's city.
  2. We check which carriers call AECT from Jebel Ali, whether the service is direct or via a hub, or which Ro-Ro, breakbulk or bulk option fits.
  3. The importer confirms the IEC, GSTIN and any licence, and appoints a clearing agent at Ennore.
  4. We book space, release the empty container or fix the breakbulk booking, and send you the cut-off dates.
  5. We arrange trucking from the shipper's site to Jebel Ali and handle UAE export clearance.
  6. The carrier issues the bill of lading with Ennore as the port of discharge. We send copies to the consignee and the clearing agent.
  7. The clearing agent files the Bill of Entry on ICEGATE before the ship arrives.
  8. The ship berths at AECT or the assigned berth, duty is paid and customs releases the cargo.
  9. The consignee's transporter or the rail operator collects the cargo within free time.

How to ship from Kamarajar port to Dubai

We also handle the other direction: cargo from Ennore to Dubai, with arrival at Jebel Ali, Khalifa Port or Sharjah port. Containers that load at AECT and cars on car carrier services are the usual fits, since Ennore is a busy car export port. We book the space with the carrier and run the UAE side. The Indian export papers stay with the shipper or its Indian agent.

The India export side

  • Import Export Code. The exporter needs an IEC from DGFT, and registers an authorised foreign exchange dealer code through which the export proceeds will come in.
  • Shipping bill. The exporter or its customs broker files the shipping bill electronically, by upload on ICEGATE or through a customs service centre. The system then gives a shipping bill number.
  • Examination and Let Export Order. Customs selects goods for checking on risk. When the check is clear, the shed appraiser gives the Let Export Order.
  • Loading. No export goods can be loaded until the ship has its entry outward order, so the shipper's agent watches both dates.
  • Certificate of origin. Indian goods that meet the India-UAE CEPA origin rules can travel with a preferential certificate of origin, which DGFT has issued online since 1 May 2022. Ask the shipper to apply before the ship sails.
  • Port code. The shipping bill and the bill of lading must name Ennore (INENR) as the port of loading if the box sails from AECT, not Chennai port.

The UAE import side

On arrival, the declaration goes to Dubai Customs with the commercial invoice, packing list, bill of lading, certificate of origin and any permit for restricted goods. A company with a Dubai Customs business code can file it, or a licensed clearing agent with the owner's authorisation. Customs duty is 5% of the CIF value for most goods, with 50% on alcohol and 100% on cigarettes. Import VAT is 5%, and a VAT-registered importer whose customs number is linked to its tax registration accounts for it on the VAT return instead of paying at the border.

  1. Send us the shipper's details in India, the cargo, the HS code, the weight or volume and the UAE delivery address.
  2. We book space with the carrier and send the booking and cut-offs to the shipper.
  3. The shipper or its trucker brings the box or the vehicles to Ennore inside the carrier cut-off.
  4. The shipper or its customs broker files the shipping bill and gets the Let Export Order.
  5. We check the draft bill of lading against the invoice and packing list.
  6. We file the UAE declaration before the ship arrives.
  7. We arrange payment of the duty and VAT, and collect the delivery order.
  8. We truck the cargo to your site and return the empty container inside free time.

[AMIR-FACT: the carriers we actually use from Kamarajar (Ennore) to Jebel Ali, Khalifa Port or Sharjah, direct or via a hub, and our real transit days in this direction]

Free time, demurrage and detention at Ennore

Free time is set by the terminal tariff and by each carrier, not by one port rule. KPL publishes its scale of rates, and the liquid and coal terminals publish their own. Ask for the free days in writing at booking, and remember that a box moving by rail to Bengaluru or Hyderabad keeps using the carrier's free time inland. Our article on demurrage and detention explains how these charges build up.

Checklist before you ship to Kamarajar port

  • The carrier confirms that the service discharges at Ennore (AECT), not Chennai or Kattupalli.
  • The importer's IEC and GSTIN are confirmed, and a clearing agent at Ennore has the documents.
  • The HS code and duty, including any CEPA preference, are checked.
  • For rail moves: the inland depot and who files the Bill of Entry are agreed.
  • For vehicles and machinery: Ro-Ro space inbound is confirmed with the carrier.
  • For DG: carrier approval, SDS and DG declaration are ready.
  • Free time on the container is agreed in writing.

Common mistakes on shipments to Ennore

  • Treating Ennore and Chennai as the same port. They have different terminals, codes and trucking routes.
  • Assuming the 18 m draft applies to containers. AECT still works to 15 m.
  • Booking inbound vehicles on a car carrier without checking space. Most car carrier calls are planned for exports.
  • Filing the Bill of Entry late, which eats into free time.
  • Claiming CEPA preference on goods that only passed through Dubai.

Frequently asked questions

Is Kamarajar port the same as Ennore port?

Yes. Ennore Port was renamed Kamarajar Port in 2014, and the company is now Kamarajar Port Limited. Shippers and carriers still use both names, and the UN/LOCODE is INENR.

Is Kamarajar port part of Chennai port?

It is a separate port about 24 km north of Chennai, with its own terminals and code. The company is owned by Chennai Port Authority, but your booking must name Ennore, not Chennai.

Who runs the container terminal at Kamarajar port?

Adani Ennore Container Terminal (AECT) runs it under a concession signed in 2014. Phase 1 has a 400 m quay, 15 m draft and capacity of 0.8 million TEU, with 1.4 million TEU planned.

How deep is Kamarajar port?

Since July 2026 the port has an 18 m operational draft, after the channels were deepened to 23 m outside and 22 m inside. Individual berths differ, for example 15 m draft at the container terminal.

How much cargo does Kamarajar port handle?

KPL handled 48.41 million tonnes in FY2024-25 against a capacity of 58.44 million tonnes. The container terminal handled 681,124 TEU in that year.

Can I ship vehicles or machinery to Ennore?

Yes. Two general cargo berths handle cars, machinery and general cargo, and GCB2 alone can take about 300,000 cars a year. Inbound space depends on car carrier and Ro-Ro schedules.

Can containers go from Ennore to Bengaluru or Hyderabad by rail?

Yes. AECT has an on-dock rail siding with links towards Bengaluru, and CONCOR started a rail service from Ennore to ICD Sanathnagar in Hyderabad in August 2026.

Can I ship dangerous goods to Kamarajar port?

Yes. The port has liquid and LNG terminals for bulk hazardous cargo, and DG containers move through AECT once the carrier and terminal accept the UN number and class.

Can you ship cargo from Ennore to Dubai?

Yes. The shipper or its customs broker files the shipping bill and gets the Let Export Order in India. We book the space, file the Dubai Customs declaration before arrival, arrange payment of the 5% duty and 5% VAT, and deliver to your site.

Get a quote for Kamarajar port shipping

Send us the cargo details and the consignee's city, and we will check which service reaches Ennore and how the cargo moves inland. Use our freight rate inquiry form, or contact our team to talk through a breakbulk, Ro-Ro or DG shipment first. Our Dubai freight forwarding team handles the UAE side.

Sources

Reviewed: 10 November 2026

Tell us what you are shipping.

Reply within one working day, Monday to Friday, 8:00 to 16:00 Dubai time.