
New Mangalore port shipping covers Karnataka's only major port, run by the New Mangalore Port Authority (NMPA) at Panambur, Mangaluru. It is a busy crude, LPG, coal and iron ore port with one container terminal, run by JSW at Berth 14, that handled 192,307 TEU in the year to March 2026. This guide covers the berths and their draft, the container terminal, the cargo that moves here, the short version of Indian customs and how we ship from Dubai to New Mangalore. We ship in both directions: from Dubai to New Mangalore, and from New Mangalore to Dubai with clearance in the UAE.
New Mangalore port at a glance
| Item | Detail |
|---|---|
| Port authority | New Mangalore Port Authority, under the Ministry of Ports, Shipping and Waterways |
| Location | Panambur, Mangaluru, Dakshina Kannada district, Karnataka, west coast of India |
| Major port since | 4 May 1974, inaugurated 11 January 1975 |
| Port codes seen on bookings | INNML (New Mangalore) and INIXE (Mangalore) |
| Berths | 16 numbered berths plus a single point mooring (SPM) for crude |
| Deepest berth draft | 14.0 m at Berths 10, 11 and 13 to 16; 21 m at the SPM |
| Container terminal | JSW Mangalore Container Terminal at Berth 14, 350 m quay, 14 m draft |
| Berth capacity | 105 million tonnes a year (as on 31 March 2025) |
| Cargo in FY2024-25 | 46.01 million tonnes |
| Cargo, April to October 2026 | 28.81 million tonnes, up 6.08% on a year earlier |
| Containers in FY2025-26 | 192,307 TEU |
| Road and rail | NH 66, 75 and 169; Southern, South Western and Konkan railways |
| Customs filing | Bill of Entry on ICEGATE, same rules as every Indian port |
| New Mangalore to Dubai | Shipping bill filed in India by the shipper or its broker; Dubai Customs declaration on arrival at Jebel Ali, Khalifa Port or Sharjah |
What is New Mangalore port and who runs it?
The old Mangalore port sat where the Gurupur and Netravati rivers meet, and it could not keep up with trade. The Mangalore Harbour Project started in 1962, work on the new harbour began in 1968, and New Mangalore became India's 9th major port on 4 May 1974. Indira Gandhi opened it with four berths on 11 January 1975. Today it is the New Mangalore Port Authority under the Major Port Authorities Act 2021.
NMPA calls it the deepest inner harbour on the west coast, with a 14 m draft. It sits about 170 nautical miles south of Mormugao and 191 nautical miles north of Kochi. The port says it is 100% solar powered and ISPS compliant.
Much of its cargo belongs to big industrial users close by: the MRPL refinery, ONGC, HPCL, IOC, Total Gaz, KIOCL, Mangalore Chemicals and Fertilizers and the UPCL power plant. That is why crude oil, LPG and coal dominate the tonnage, while containers are a smaller but growing trade.
Which berths does New Mangalore port have?
NMPA publishes the permissible draft, length and ship size for each berth. Here is the official list, with the capacity NMPA gives for each berth as on 31 March 2025.
| Berth | Main cargo | Draft | Length | Max DWT | Capacity (million t) |
|---|---|---|---|---|---|
| 1 | General cargo | 7.00 m | 125 m | 4,000 | 0.5 |
| 2 | General cargo | 10.50 m | 198 m | 30,000 | 3.0 |
| 3 | General and liquid cargo | 10.30 m | 198 m | 30,000 | 3.4 |
| 4 | Cruise, general cargo, chemicals, edible oil | 9.50 m | 198 m | 30,000 | 2.0 |
| 5 | General cargo, bulk cement, edible oil, bitumen | 9.50 m | 198 m | 30,000 | 1.9 |
| 6 | General cargo, edible oil | 9.50 m | 198 m | 30,000 | 1.7 |
| 7 | General cargo, bitumen, iron ore fines | 9.50 m | 198 m | 30,000 | 2.5 |
| 8 | General cargo, iron ore pellets (mechanised), iron ore fines | 12.50 m | 300 m | 60,000 | 6.0 |
| 9 | LPG, edible oil, bitumen, POL, chemicals | 10.50 m | 330 m | 45,000 | 3.2 |
| 10 | Crude oil, POL products | 14.00 m | 320 m | 85,000 | 13.3 |
| 11 | POL products | 14.00 m | 320 m | 85,000 | 12.4 |
| 12 | POL, LPG, edible oil, bitumen, chemicals | 12.50 m | 320 m | 50,000 | 3.3 |
| 13 | LPG, petrochemicals | 14.00 m | 350 m | 85,000 | 4.0 |
| 14 (PPP) | Containers and other cargo | 14.00 m | 350 m | 90,000 | 8.3 |
| 15 (captive) | Coal for UPCL, edible oil and other liquids for other users | 14.00 m | 350 m | 90,000 | 13.8 |
| 16 (PPP) | Coal and other bulk | 14.00 m | 325 m | 90,000 | 6.7 |
| SPM | Crude oil | 21.00 m | - | 300,000 | 19.1 |
Two things stand out for a shipper from the UAE. First, the general cargo berths (4 to 7) only take 9.5 m of draft, so a breakbulk ship has to arrive light enough for them or be given a deeper berth. Second, the deep berths are mostly tied to liquids and coal, so Berth 14 is the main deep-water option for containers and much of the other dry cargo.
The container terminal at Berth 14
Containers at New Mangalore go through JSW Mangalore Container Terminal Pvt Ltd at Berth 14. NMPA's milestones record mechanised container handling starting there on 29 March 2022. JSW runs it under a 30-year design, build, finance, operate and transfer concession.
| Item | Detail |
|---|---|
| Quay | 350 m at Berth 14, 14 m draft |
| Largest ships | Built for mainline ships up to 9,000 TEU |
| Equipment (JSW) | 3 mobile harbour cranes, 8 reach stackers, 1 empty handler, 2 mobile hoppers |
| Backup area | 15.5 hectares |
| Capacity | 239,148 TEU a year in phase one, 358,722 TEU in phase two |
| Throughput | 192,307 TEU in FY2025-26; 95,759 TEU from April to September 2026 |
JSW lists mobile harbour cranes, not ship-to-shore gantries. Ships are worked by those mobile cranes or by their own gear, so ask the carrier how it plans to load heavy or out-of-gauge boxes. NMPA's own record parcel was 2,689 TEU on one ship on 30 June 2023.
To bring in more container calls, NMPA is cutting charges for container ships berthing between 3 November 2026 and 31 March 2027. Mainline ships get 50% off berth hire, port dues and pilotage, and feeders get 35% off the same charges. That is a cost to the shipping line, not to you, but it may mean more services calling the port this season.
What cargo moves through New Mangalore port?
By tonnage, crude oil is far ahead. From April to October 2026 the port unloaded 10.3 million tonnes of crude, about 4.6 million tonnes of coal and 1.6 million tonnes of LPG. Containers made up about 1.48 million tonnes of the 28.81 million tonne total. NMPA calls itself India's largest coffee exporting port.
The container trade has its own pattern. These were the biggest container flows from April to September 2026, from NMPA's monthly statement:
| Direction | Commodity | TEU, April to September 2026 |
|---|---|---|
| Import | Raw cashew | 20,642 |
| Import | Tiles | 7,723 |
| Import | Wood | 912 |
| Import | Bentonite powder and lumps | 830 |
| Export | Coffee | 6,274 |
| Export | Fish meal | 5,712 |
| Export | Machinery | 2,050 |
| Export | Reefer cargo | 2,026 |
| Export | Gherkins and cucumbers | 1,420 |
Empty boxes are a big part of the export side, with 17,759 empty TEU shipped out in the same six months. Another 11,451 empty TEU came in, so carriers move a lot of equipment through the port in both directions.
Shipping from Dubai to New Mangalore: FCL, LCL and carriers
Most cargo from Dubai moves in containers from Jebel Ali Port. Cogoport's lane data lists Jebel Ali to Mangalore as an import lane, and Jebel Ali, Abu Dhabi, Sharjah and Dammam as export lanes. When a direct mainline service by Hong An started in April 2023, its rotation offered direct connections to Jebel Ali and to Khalifa Port in Abu Dhabi.
Feeders carry a large share. Cogoport's March 2026 snapshot tracked 8,678 TEU of capacity at the port: Global Feeder Shipping 28.1%, SM Line 25.0%, X-Press Feeders 15.6%, CMA CGM 13.2%, Unifeeder 12.1% and TWF Logistics 5.9%. That is a capacity snapshot, not a timetable, so ask whether your booking is direct or goes through a hub.
[AMIR-FACT: Our real Jebel Ali to New Mangalore transit time in days, whether the service we book is direct or via a hub such as Colombo or Nhava Sheva, and the carriers or feeders we use on this lane]
| Your shipment | Best fit | Why |
|---|---|---|
| Enough cargo for a 20ft or 40ft box | FCL to Berth 14 | One container, one Bill of Entry, no shared handling |
| A few pallets | LCL, if a consolidator runs to Mangalore | If not, compare LCL to Cochin or Nhava Sheva plus trucking |
| Frozen or chilled goods | Reefer FCL | Reefer cargo moves both ways here, so check plug and monitoring charges |
| Oversized machinery | Flat rack or breakbulk | Check the berth draft and the mobile crane lift limit |
Not sure which pays off for your volume? Read our guide to FCL vs LCL. Our sea freight service covers both from the UAE.
Dwell time can be long. Cogoport's data showed average import dwell of 10.7 days in September 2025 and 6.4 days in October 2025, with export dwell between 3.3 and 7.3 days from August 2025 to January 2026. File the Bill of Entry early to stay inside free time.
Breakbulk, bulk and project cargo at New Mangalore
NMPA says the port is equipped for heavy lifts, machinery and project cargo, and it has wide storage for them. Its published list includes transit and overflow sheds, covered godowns of up to 5,625 sq m, and open stackyards from 9,300 sq m to a 275,486 sq m yard near the KK gate. The port's own equipment is light (two 63-tonne mobile cranes and 45-tonne reach stackers), and the terminal operator's harbour mobile cranes are rated at 155 tonnes, so heavy pieces often rely on the ship's own gear.
For a project parcel to New Mangalore, the heaviest piece and the ship's draft decide the plan:
- We collect weight, dimensions and lifting points for every piece.
- We match the cargo to a ship: container ship with flat racks, or a multipurpose ship with its own cranes.
- We check the ship's arrival draft against the berth it will use, because Berths 4 to 7 only take 9.5 m.
- The consignee's transporter plans the road route from Panambur, using NH 66 or the routes inland.
Our break bulk shipping service and bulk cargo service cover the UAE side of these moves.

Dangerous goods and liquids at New Mangalore
NMPA lists hazardous cargo, liquid chemicals, crude and POL products among the cargo it is equipped to handle, and it publishes the fire fighting facilities at its oil terminals. The port has a large tank farm: its storage list runs from edible oil and methanol tanks inside the wharf oil terminal to phosphoric acid and ammonia tanks for the fertiliser plant.
Containerised DG goes through Berth 14 like any other box, once the carrier and terminal accept the UN number and class.
- We send the safety data sheet, UN number, class and packing group to the carrier for approval.
- The shipper prepares the dangerous goods declaration and the IMDG packaging, labels and placards.
- The consignee's clearing agent checks whether the product needs an Indian licence or permit.
- For a bulk liquid parcel, the receiver books tank space with one of the port's tank operators before the ship sails.
Our dangerous goods shipping service handles classification and carrier approval from the UAE.
Customs at New Mangalore: the short version
Indian customs rules are the same at every port, and our Nhava Sheva port guide covers them in full. Here is what you need for New Mangalore:
- The importer needs an Import Export Code (IEC), a 10-digit number issued by DGFT.
- The Bill of Entry is filed on ICEGATE. One filed before arrival stays valid if the ship arrives within 30 days.
- Supporting documents go up through e-Sanchit first. The Bill of Entry cannot be submitted until they are in.
- To claim IGST credit, the Bill of Entry must show the importer's GSTIN and state code.
- Deferred duty payment is open to importers with AEO T-2 or T-3 status.
The India-UAE CEPA has been in operation since 1 May 2022. Goods made in the UAE that meet the origin rule can claim lower Indian duty at New Mangalore with a valid certificate of origin, uploaded on e-Sanchit with the other supporting papers before the Bill of Entry goes in. Goods only stored in or re-exported through Dubai usually do not qualify, so check where the cargo was actually made before the broker claims the rate.
We do not file Indian customs entries. We prepare the UAE export side and work with the consignee's customs broker or a destination clearing agent at New Mangalore.
Which documents should travel with a New Mangalore shipment?
| Document | Who provides it | New Mangalore tip |
|---|---|---|
| Commercial invoice | Shipper in the UAE | Value and HS code must match the Bill of Entry |
| Packing list | Shipper | Piece weights matter for mobile crane lifts |
| Bill of lading | Carrier, via us | Port of discharge must read New Mangalore, not Cochin or a hub port |
| Certificate of origin | UAE issuing authority | Needed to claim CEPA preference |
| DG declaration and SDS | Shipper | For any DG cargo |
| IEC, GSTIN and any licence | Importer in India | Declared on the Bill of Entry |
How does cargo leave New Mangalore port?
New Mangalore has better inland links than its size suggests. NMPA lists road connectivity to three national highways (NH 66, 75 and 169) and rail connectivity to three zonal railways: Southern, South Western and Konkan. NH 66 runs right past the port, and Mangaluru International Airport is a few kilometres away.
| Consignee location | Usual inland route | Check before you ship |
|---|---|---|
| Mangaluru and Udupi coast | Truck on NH 66 | Delivery order and gate timing at Berth 14 |
| Bengaluru and south Karnataka | Truck via NH 75, or rail | Compare with Chennai or Cochin plus trucking |
| Coffee and plantation districts inland | Truck via NH 169 or NH 75 | Road route for heavy pieces in hilly sections |
| Coastal Karnataka north to Goa | Truck on NH 66 or Konkan Railway | Compare with Mormugao for some cargo |
How to ship from Dubai to New Mangalore: step by step
- Send us the cargo details: commodity, HS code, weight, dimensions, number of pieces and the consignee's city.
- We check which carriers serve New Mangalore from Jebel Ali or Khalifa Port, and whether the service is direct or via a hub.
- The importer confirms the IEC, GSTIN and any licence, and appoints a clearing agent at New Mangalore.
- We book space, release the empty container or fix the breakbulk booking, and send you the cut-off dates.
- We arrange trucking from the shipper's site to the UAE port and handle UAE export clearance.
- The carrier issues the bill of lading. We send copies to the consignee and the clearing agent.
- The clearing agent files the Bill of Entry on ICEGATE before the ship arrives.
- The ship berths at Berth 14 or the assigned berth, duty is paid and customs releases the cargo.
- The consignee's transporter collects the cargo within free time.
How to ship from New Mangalore to Dubai
We also handle the other direction: cargo from New Mangalore to Dubai, with arrival at Jebel Ali, Khalifa Port or Sharjah port. Containers from the JSW terminal at Berth 14 are the usual fit, including coffee and other Karnataka exports. We book the space with the carrier and run the UAE side. The Indian export papers stay with the shipper or its Indian agent.
The India export side
- Import Export Code. The exporter needs an IEC from DGFT, and registers an authorised foreign exchange dealer code through which the export proceeds will come in.
- Shipping bill. The exporter or its customs broker files the shipping bill electronically, by upload on ICEGATE or through a customs service centre. The system then gives a shipping bill number.
- Examination and Let Export Order. Customs selects goods for checking on risk. When the check is clear, the shed appraiser gives the Let Export Order.
- Loading. No export goods can be loaded until the ship has its entry outward order, so the shipper's agent watches both dates.
- Certificate of origin. Indian goods that meet the India-UAE CEPA origin rules can travel with a preferential certificate of origin, which DGFT has issued online since 1 May 2022. Ask the shipper to apply before the ship sails.
The UAE import side
When the box from New Mangalore arrives in the UAE, the Dubai Customs declaration is filed with the Indian shipper's commercial invoice and packing list, the bill of lading, a certificate of origin (the preferential CEPA certificate where the goods qualify) and any permit for restricted goods. Either a company with its own Dubai Customs business code files it, or a licensed clearing agent does so with the owner's authorisation. For most goods, customs duty is 5% of the CIF value; alcohol pays 50% and cigarettes 100%. Import VAT is 5%. A VAT-registered importer whose customs number is linked to its tax registration accounts for that VAT on its return instead of paying at the border.
- Send us the shipper's details in India, the cargo, the HS code, the weight or volume and the UAE delivery address.
- We book space with the carrier and send the booking and cut-offs to the shipper.
- The shipper or its trucker brings the box to the Berth 14 terminal inside the carrier cut-off.
- The shipper or its customs broker files the shipping bill and gets the Let Export Order.
- We check the draft bill of lading against the invoice and packing list.
- We file the UAE declaration before the ship arrives.
- We arrange payment of the duty and VAT, and collect the delivery order.
- We truck the cargo to your site and return the empty container inside free time.
[AMIR-FACT: the carriers we actually use from New Mangalore to Jebel Ali, Khalifa Port or Sharjah, direct or via a hub, and our real transit days in this direction]
Free time, demurrage and detention at New Mangalore
Port storage charges are set in NMPA's Scale of Rates and the terminal operator's tariff, while container free time is set by each carrier. Ask for the free days in writing at booking and compare them with the import dwell times above. If your clearing agent usually needs a week, a short free-time offer will cost you. Our article on demurrage and detention explains how these charges build up.
Checklist before you ship to New Mangalore
- The importer's IEC and GSTIN are confirmed.
- A clearing agent at New Mangalore has the documents.
- The HS code and duty, including any CEPA preference, are checked.
- The carrier's service and any transshipment port are confirmed.
- For breakbulk: the ship's draft fits the berth, and piece weights suit the cranes.
- For DG: carrier approval, SDS and DG declaration are ready.
- The bill of lading names New Mangalore as the port of discharge.
- Free time is agreed in writing.
Common mistakes on shipments to New Mangalore
- Mixing up the old Mangalore port and New Mangalore, or the two port codes, on bookings.
- Assuming every container service calls direct. Many use feeders through a hub.
- Sending a deep-laden breakbulk ship to a 9.5 m general cargo berth.
- Planning a heavy lift without checking crane capacity at the berth.
- Filing the Bill of Entry late when import dwell is already long.
- Claiming CEPA preference on goods that only passed through Dubai.
New Mangalore or another Indian port: which fits your cargo?
| Your situation | Port to look at first | Why |
|---|---|---|
| Consignee in coastal or central Karnataka | New Mangalore | Shortest inland leg and three highways inland |
| Consignee in central Kerala near Kochi | Cochin | Direct port for central Kerala |
| Consignee in Mumbai, Pune or western India | Nhava Sheva | Largest container port for the west |
| Consignee in Chennai or Tamil Nadu | Chennai | East coast gateway for Tamil Nadu |

Frequently asked questions
Is New Mangalore port the same as Mangalore port?
Not quite. New Mangalore Port at Panambur is the major port that handles ocean shipping. The old Mangalore port is a small port at the river mouth further south. Bookings may show the codes INNML or INIXE for New Mangalore.
Who operates the container terminal at New Mangalore?
JSW Mangalore Container Terminal Pvt Ltd runs it at Berth 14 under a 30-year concession. Mechanised container handling started there on 29 March 2022.
What is the maximum draft at New Mangalore port?
The deepest berths, including Berth 14 for containers, take 14 m. The crude oil single point mooring takes 21 m, and the general cargo berths 4 to 7 take 9.5 m.
How many containers does New Mangalore handle?
It handled 192,307 TEU in the year to March 2026. From April to September 2026 it handled 95,759 TEU.
Is there a direct ship from Dubai to New Mangalore?
Some services have offered direct connections to Jebel Ali and Khalifa Port, but many boxes move on feeders through a hub. We confirm the routing when we quote.
What cargo does New Mangalore port handle?
Crude oil, POL products, LPG, coal and iron ore make up most of the tonnage. In containers, raw cashew and tiles lead imports, and coffee and fish meal lead exports.
Can I ship dangerous goods to New Mangalore?
Yes. NMPA lists hazardous cargo and liquid chemicals among what it handles. Containerised DG needs carrier and terminal acceptance, and the consignee should check Indian licence rules first.
Who clears my cargo at New Mangalore?
The importer or its customs broker files the Bill of Entry on ICEGATE using the importer's IEC and GSTIN. Anil Darya handles the UAE export side and works with the broker at New Mangalore.
Can you ship cargo from New Mangalore to Dubai?
Yes. On the Indian side, the shipper or its customs broker files the shipping bill and gets the Let Export Order before the box is loaded at Berth 14. We book the space, file the Dubai Customs declaration before arrival, arrange payment of the 5% duty and 5% VAT, and deliver to your site.
Get a quote for New Mangalore port shipping
Send your cargo details through our freight rate inquiry form and we will come back with a routing and price from Jebel Ali or Khalifa Port to New Mangalore. For a breakbulk, project or DG shipment, contact our team first so we can check the berth and carrier options. You can also read more about our Dubai freight forwarding team.
Sources
- NMPA: Berth particulars (draft, length, DWT, cargo per berth)
- NMPA: Berth capacity as on 31 March 2025
- NMPA: Storage capacity, tanks and cargo handling equipment
- NMPA: What we offer (14 m draft, highways, railways, cargo handled, coffee)
- NMPA: Brief history (1962, 1974, 1975, FY2024-25 cargo, port users)
- NMPA: Milestones (berth commissioning dates, container handling at Berth 14 from 29 March 2022)
- NMPA: Commodity-wise traffic, October 2026
- NMPA: Containerised traffic, September 2026
- Maritime Gateway: New Mangalore Port rebate for container ships (November 2026; FY2025-26 TEU, Berth 14 data, Hong An service)
- Maritime Gateway: JSW Infrastructure commissions container terminal at NMPT (April 2022)
- JSW Infrastructure: Mangalore container terminal (equipment)
- Cogoport: Port of Mangalore (lanes, operator capacity snapshot March 2026, dwell times)
- Shipnext: New Mangalore port (INNML) restrictions
- Wikipedia: New Mangalore Port (location, distances, record parcel, transport links)
- ICEGATE: FAQ (IEC, Bill of Entry, e-Sanchit, GSTIN, deferred duty)
- DGFT Trade Notice 05/2022-23: India-UAE CEPA certificates of origin from 1 May 2022
- Chennai Customs: Export procedure (IEC, shipping bill, examination, Let Export Order)
- Dubai Customs: Submit customs declaration (required documents)
- Dubai Customs: FAQ (5% of CIF, alcohol and cigarettes, business code, clearing agents)
- UAE Government portal: Clearing the customs and paying customs duty
- Federal Tax Authority: Taxable person guide for VAT (5% import VAT, reverse charge for registered importers)
Reviewed: 10 November 2026
