
Port of Gdynia shipping covers a Baltic port with two container terminals, a busy ro-ro and ferry business, bulk terminals and full-length train sidings. In 2025 the port passed 1 million TEU for the first time, and since 2026 it can take container ships of up to 400 m. This guide covers the BCT and GCT terminals, what each one handles, customs at the port and how we ship your cargo there from Dubai. We ship both from Dubai to Gdynia and from Gdynia to Dubai.
Port of Gdynia at a glance
| Item | Detail |
|---|---|
| Port authority | Port of Gdynia Authority S.A. (ZMPG), set up in 1999 by the City of Gdynia and the State Treasury |
| UN/LOCODE | PLGDY |
| Location | Western shore of the Gulf of Gdansk, 54°32'N 18°34'E |
| Container terminals | Baltic Container Terminal (BCT, ICTSI) and Gdynia Container Terminal (GCT, Hutchison Ports) |
| Containers in 2025 | Over 1 million TEU, up 5.27% on 2024 |
| Total cargo in 2025 | 25.7 million tonnes |
| Largest ship | Up to 400 m long and 14.5 m draught at the Helskie Quay |
| Quays | 17,700 m, of which over 11,000 m used for cargo handling |
| Port area | 973 ha, including 621 ha of land |
| Tides | None; water level can move about 60 cm with strong winds |
| Working hours | 24 hours a day in three shifts |
| Customs branches at the terminals | Baza Kontenerowa (BCT) and Nabrzeze Bulgarskie (GCT) |
| Import VAT (Poland) | 23% standard; reduced rates or exemptions depend on the goods and applicable rules |
| Shipping to Dubai | We also ship from Gdynia to Jebel Ali, Khalifa Port or Sharjah. Dubai duty is 5% of CIF for most goods, plus 5% import VAT |
Where is the Port of Gdynia and what is it used for?
Gdynia sits on the western shore of the Gulf of Gdansk, a short distance north of Gdansk. The Hel Peninsula shelters the roadstead, and a 2.5 km outer breakwater protects the port. The port authority calls it a universal port that specialises in general cargo, mainly containers and ro-ro, with ferry lines and short sea links. It is a link in Corridor VI of the Trans-European Transport Network (TEN-T).
The cargo mix is broad. In the first half of 2026 the port handled over 13.5 million tonnes, with growth in grain and animal feed, cement and limestone, liquid fuels and ro-ro. The port reported 1,970 ship calls in that period.
Recent upgrades that change what can call
The port has spent several years making room for bigger ships. The inner entrance was widened from 100 m to 140 m, the inner waters were dredged to 15.9 m, turning basin No. 2 was enlarged to 480 m and the Helskie Quay was rebuilt. The rebuilt Helskie I quay is 800 m long with a published depth of 15.5 m. On 24 July 2026 the 399 m MSC Venice, an 18,755 TEU ship, became the largest vessel ever to call at Gdynia.
For a shipper, this means more direct ocean calls into Gdynia and fewer transfers at western European hubs. It does not mean every service calls direct, so always ask how your box reaches the port.
Which container terminals does the Port of Gdynia have?
Both container terminals are in the Western Port. Your carrier's service decides which one your box uses, and the terminal decides the customs branch, the gate hours and where your truck goes.
Baltic Container Terminal (BCT)
BCT is run by ICTSI on the Helskie Quay. BCT gives its yearly capacity as 1.2 million TEU and handles the deep-sea calls, including the largest ships that reach Gdynia.
| Feature | BCT detail |
|---|---|
| Main quay | Helskie I, 800 m long, 15.5 m deep, 14.5 m draught, five berths, one also for ro-ro |
| Second quay | Helskie II, 178.4 m long, draught up to 9.1 m, ships up to 199 m |
| Largest ship | 400 m long |
| Quay cranes | 7, including 2 megamax cranes reaching 25 rows across |
| Mobile harbour cranes | 2 at 100 t and 2 at 125 t |
| Rail inside the terminal | Three 670 m tracks, together serving 90 container wagons at a time, plus two general cargo tracks |
| Rail outside the gate | Seven tracks of about 1,000 m for forming trains |
| Covered warehouse | 20,000 m², 15,000 tonnes of general cargo, rail access for 30 wagons |
| Yards | Up to 500,000 m², with separate yards for dangerous goods and fumigation |
| Truck gate hours | Sunday 22:30 to Saturday 14:30; consult the terminal’s holiday timetable for exceptions |
BCT also has a VGM-certified weighbridge, pre-selection weighing at the gate and a 15,500 m² truck park. Truckers need a pass, and rail operators must pre-notify trains through the INCOS platform.
Gdynia Container Terminal (GCT)
GCT sits on the Bulgarian Quay and belongs to Hutchison Ports. It is smaller and focused on feeder and short sea services.
| Feature | GCT detail |
|---|---|
| Terminal area | 19.6 ha |
| Yard capacity | 12,500 TEU |
| Quay | 812 m: 447 m at 13.5 m depth, 281 m at 11 m and 84 m at 9.5 m |
| Depth planned after completion of channel works | 447 m at 15.5 m and 365 m at 11 m |
| Quay cranes | 2 super-post-Panamax (65 t), 1 post-Panamax (60 t), 1 smaller crane (41 t) |
| Reefer plugs | 514 |
| Rail siding | Over 1,523 m usable length |
| Warehouse | 2,000 m² covered |
| Heavy lifts | Up to 100 t with its own equipment |
| Truck access | Confirm the weekly gate schedule, booking window and holiday exceptions with GCT before dispatch. |
Ro-ro, ferry and bulk terminals
OT Port Gdynia handles conventional general cargo and runs a ro-ro terminal in Basin V. The port also has grain, bulk, cement, liquid fuel and LPG terminals. Ro-ro cargo grew more than 18% in 2025 and over 13% in the first half of 2026, helped by Finnlines putting its largest ships, each carrying about 400 trailers, on the Gdynia route.
Shipping services: how cargo from Dubai reaches Gdynia
The terminals publish their liner services, and they show the pattern. One deep-sea loop, MSC's Britannia service, calls BCT direct from Asia via Felixstowe, Antwerp and Gdansk. Most other calls are feeders and short sea services from Hamburg, Bremerhaven, Wilhelmshaven, Rotterdam, Antwerp and UK ports, run by carriers such as Maersk, Hapag-Lloyd, COSCO, Yang Ming, ONE and DP World.
GCT’s published service list includes connections through northern European hubs. For cargo from Dubai, confirm the complete carrier itinerary and every transshipment rather than assuming a direct vessel call. In the other direction, Greencarrier Consolidators announced a weekly LCL service from Gdynia to Jebel Ali in 2024, with a transit time of about 43 days. This was the operator’s 2024 launch schedule, not a current transit commitment; request an updated quotation and itinerary.
Request a dated quotation confirming the carrier, connecting ports, planned transit time and destination terminal for your cargo. Reconfirm schedules and cut-offs when booking.
Decision rule: compare the hub and the feeder connection on each quote, not just the ocean rate. A cheap rate with a weak feeder link can cost you a week at the hub.
What cargo can you ship through Gdynia?
| Cargo | Where it goes | What to plan |
|---|---|---|
| General goods in containers (FCL, LCL) | BCT or GCT, by carrier | Terminal on the booking, gate hours, free time |
| Chilled and frozen food | Reefer areas at BCT and GCT | Set point, border veterinary or sanitary checks |
| Steel, coils, plates, structures | BCT breakbulk berth, OT Port Gdynia | Lifting points, lashing, warehouse space |
| Wind turbine parts, transformers | BCT breakbulk berth | Piece weights, crane plan, road permits |
| Trailers and vehicles | Ro-ro terminal, BCT ro-ro berth | Vehicle documents, EU type rules |
| Grain, cement, fertiliser, fuels | Bulk and liquid terminals | Discharge plan, receiving facility |
| Dangerous goods | Separate DG yard at BCT | IMDG documents, carrier acceptance |
FCL and LCL shipping to Gdynia
With FCL you book a whole box and it moves straight from the terminal to your door. With LCL your goods share a container that is unpacked at a consolidator's warehouse after release, which adds a step and ties your release to the consolidator's paperwork. Our guide to FCL and LCL costs shows where the break-even usually falls.
Reefer cargo is well served. GCT has 514 reefer plugs, and BCT runs a dedicated reefer area where staff check the temperature every 4 hours. MSC's logistics arm MEDLOG is also building a cold store in the port's Logistics Centre, with over 30,000 pallet spaces and more than 20 truck bays, due in 2027.
Once your box lands, terminal storage and the line's free time both start counting. Our article on demurrage and detention explains the difference.
Breakbulk and project cargo at the Port of Gdynia
BCT runs a dedicated berth for breakbulk and oversized cargo, for ships up to 195 m long, and handles more than 130 non-container ships a year. After recent equipment upgrades it can lift single units of up to 250 tonnes and 70 m long. Typical cargo includes steel coils, sheets and slabs, wind turbine components, steel structures, crane parts and transformers. BCT also lashes and unlashes oversized cargo on flat racks, open tops and in ships' holds.

How we plan a project move from the UAE to Gdynia:
- Collect drawings, weights, dimensions and centre of gravity for each piece.
- Choose flat racks on a container service or breakbulk tonnage.
- Check the piece against BCT's 250 t and 70 m limits and the 195 m ship limit at the breakbulk berth.
- Agree lashing and storage, using the covered warehouse if the cargo must stay dry.
- Have the consignee's agent arrange road permits and escorts in Poland before arrival.
Our guide to flat racks, open tops and out-of-gauge cargo helps with the first choice, and our break bulk and project cargo service covers the rest.
Dangerous goods through the Port of Gdynia
BCT keeps a separate yard for dangerous goods and publishes its own handling and storage instruction for IMDG cargo. The port's basic data also sets a stricter towing rule for ships carrying dangerous cargo: tugs are compulsory for these ships from 70 m long, against 90 m for other ships.
What you need for a DG booking to Gdynia:
- UN number, proper shipping name, class and packing group where assigned.
- Safety Data Sheet where required for classification and carrier assessment.
- A signed Dangerous Goods Declaration.
- Packaging, labels and container placards required by the applicable IMDG provisions and packing instruction.
- Carrier acceptance on every leg, including the feeder from the hub.
Some feeder operators restrict certain dangerous-goods classes, so acceptance must cover every leg. Our dangerous goods shipping team checks acceptance on each leg before you commit.
Customs at the Port of Gdynia: what is specific to this port
Poland's import rules are the same at every port, and our Gdansk guide covers them in full. Here is the short version, then what is different at Gdynia.
The short customs summary
| Rule | What it means for a Dubai shipment |
|---|---|
| Entry Summary Declaration (ICS2) | Maritime deployment began on 3 June 2024. Agree who supplies and files the lowest house-level data: the carrier may file a complete ENS, or the relevant parties may use multiple filing. |
| EORI number | The Polish importer needs one for the import declaration |
| Customs duty | The EU rate in TARIC for your HS code and origin |
| Import VAT | 23% standard; reduced rates or exemptions depend on the goods and applicable rules |
Customs branches at the two terminals
Each terminal has its own customs branch under the Pomeranian Customs and Fiscal Office in Gdynia. Use the right one on transit documents and in the declaration.
| Terminal | Customs branch | Code | Temporary storage facility |
|---|---|---|---|
| BCT | Oddzial Celny "Baza Kontenerowa" w Gdyni | PL321030 | PLTST321000190010 |
| GCT | Oddzial Celny "Nabrzeze Bulgarskie", in the GCT administration building | PL321070 | PLTST321000190011 |
How release works in the terminal systems
At BCT every import container is put on customs hold automatically in the terminal system. Only a customs officer, or a customs agent with permissions granted by BCT, can lift it. At GCT goods in temporary storage get an automatic "DT" hold, in both directions and even for EU-status goods. A customs officer, an authorised person with AEO status or a simplified procedure permit, or the automatic release through the Polish Port Community System can clear it.
What this means for you: your Polish customs agent needs access to the right terminal system. Ask the consignee to confirm this before the ship arrives, or the box can sit on hold after clearance.
Border inspections at BCT
The veterinary inspectorate, the border sanitary station, the plant health inspection, the customs branch and the Border Guard all work on BCT's premises. The port's Border Veterinary Control Point is also at BCT. For food, plant or animal products, send health certificates to the consignee's agent early so the check can be booked.

Moving cargo inland from Gdynia
Rail is Gdynia's strong point. BCT can take full-length trains, with three 670 m container tracks inside the terminal and seven tracks of about 1,000 m outside. GCT has over 1,523 m of siding. The port authority has also electrified and expanded the rail access to the western port, and its Logistics Centre intermodal project provides for two tracks of approximately 750 m; confirm operational availability before planning a shipment.
| Final destination | Usual onward mode |
|---|---|
| Gdynia, Gdansk and Pomerania | Truck from the terminal |
| Central and southern Poland | Rail from BCT or GCT, or truck |
| Scandinavia | Ferry or ro-ro from Gdynia |
Book the onward leg early. The rail operator needs the container number and the customs release before the train slot.
How to ship from Dubai to the Port of Gdynia, step by step
We book space, prepare documents, handle trucking and export clearance in the UAE, and work with the consignee's customs agent in Poland.
- Send us the cargo details: commodity, HS code, weight, volume or dimensions, Incoterm and the final address in Poland.
- We compare services from Jebel Ali Port and confirm the hub and the Gdynia terminal for each.
- We book space. For DG, reefer or out-of-gauge cargo, we get acceptance for every leg first.
- We truck the cargo or empty container in the UAE and file the UAE export declaration.
- We check the invoice, packing list, certificate of origin and draft bill of lading, with the importer's EORI on the documents.
- Confirm the ICS2 filing arrangement and applicable deadline before loading. Supply complete cargo data for either the carrier’s single filing or the agreed master and house-level filings.
- The consignee's agent files the Polish import declaration and gets release in the BCT or GCT system.
- The consignee books the truck or train within gate hours and free time, and returns the empty.
How to ship from the Port of Gdynia to Dubai
We also handle the other direction: shipping from Gdynia to Dubai, with arrival at Jebel Ali, Khalifa Port or Sharjah port. We book the space with the carrier and run the UAE side. The Polish export papers stay with the shipper or its Polish agent.
The Polish export side
- Export declaration. The exporter or its declarant lodges it electronically in the EU Automated Export System (AES), at the customs office where the exporter is established or where the goods are packed or loaded.
- Polish filing channel. In Poland the declaration goes through PUESC, the customs and tax services platform, into AES.
- Exit. The office of export passes the data to the customs office of exit at the port, which checks the goods and confirms they have left the EU.
The UAE import side
On arrival, the import declaration goes to Dubai Customs with the commercial invoice, packing list and certificate of origin, plus a permit from the relevant authority for restricted goods. The carrier releases the delivery order against the bill of lading. Customs duty in Dubai is 5% of the CIF value for most goods, with 50% on alcohol and 100% on cigarettes. Import VAT is normally 5% on the customs value including freight and insurance, plus applicable customs duty and excise tax. Exemptions, zero-rating and the accounting method depend on the goods and importer.
- Send us the shipper's details in Poland, the cargo, the HS code and the UAE delivery address.
- We book space to Jebel Ali, Khalifa Port or Sharjah and send the booking and cut-offs to the shipper.
- The shipper or its trucker delivers the cargo to BCT or GCT before the cut-off.
- The shipper or its Polish agent lodges the export declaration in AES through PUESC.
- We check the draft bill of lading against the invoice and packing list before it is issued.
- We file the UAE declaration with Dubai Customs before the ship arrives.
- We arrange payment of the duty and VAT and collect the delivery order from the carrier.
- We truck the cargo to your site in the UAE and return the empty container within free time.
Request a dated quotation confirming the carrier, connecting ports, planned transit time and destination terminal for your cargo. Reconfirm schedules and cut-offs when booking.
Checklist before you ship to Gdynia
- HS code checked in TARIC for every line.
- Importer's EORI and Polish VAT number on the documents.
- Gdynia terminal (BCT or GCT) confirmed on the booking.
- Customs agent has release rights in that terminal's system.
- For DG: applicable documents, classification and acceptance on every leg confirmed.
- For food: health certificates sent before arrival.
- For project cargo: piece weights checked against BCT's lifting limits.
- Onward truck or train booked within gate hours.
- Free time agreed with the carrier, and cargo insurance arranged.
Common mistakes on Gdynia shipments
- Confusing Gdynia (PLGDY) with Gdansk (PLGDN). The ports are close but the terminals, customs branches and trucks are different.
- Assuming a direct sailing from the Gulf without checking the carrier itinerary and each connecting service.
- Missing the terminal gate window. BCT gates close at 14:30 on Saturday until late Sunday evening.
- Clearing customs but not lifting the terminal hold, so the box stays blocked.
- Booking DG cargo on the main leg only, then finding the feeder will not take it.
- Planning collection on a Polish public holiday without checking terminal-specific operating arrangements.
Gdynia or Gdansk: which Polish port fits your cargo?
| Your situation | Port to compare | Why |
|---|---|---|
| Box arriving on a feeder from Hamburg, Bremerhaven or Rotterdam | Gdynia | Many feeder and short sea services call BCT and GCT |
| Ro-ro trailers or ferry freight | Gdynia | Dedicated ro-ro terminal and growing ro-ro lines |
| Heavy breakbulk up to 250 t per piece | Gdynia (BCT) | Dedicated breakbulk berth and mobile cranes |
| Cargo that needs a free zone | Gdansk | Gdansk has a free zone; check the terms with the consignee |
| Largest deep-sea ships from Asia | Compare both | Both now take big ships; the carrier's loop decides |
We can price both ports so you can compare the total cost to your door.
Frequently asked questions
What is the port code for Gdynia?
The UN/LOCODE for Gdynia is PLGDY. Use it on bookings and bills of lading so cargo is not routed to nearby Gdansk, which is PLGDN.
How many container terminals does Gdynia have?
Two. Baltic Container Terminal (BCT) is run by ICTSI on the Helskie Quay, and Gdynia Container Terminal (GCT) is run by Hutchison Ports on the Bulgarian Quay.
How big are the ships that can call at Gdynia?
Since the Helskie Quay was rebuilt in 2026, Gdynia can take container ships up to 400 m long with a draught of up to 14.5 m. The 399 m MSC Venice called in July 2026.
How many containers does Gdynia handle?
The port passed 1 million TEU for the first time in 2025, up 5.27% on 2024. Total cargo that year was 25.7 million tonnes.
Which customs office handles containers at Gdynia?
Customs branch "Baza Kontenerowa" (PL321030) handles BCT, and branch "Nabrzeze Bulgarskie" (PL321070) handles GCT. Both belong to the Pomeranian Customs and Fiscal Office in Gdynia.
Is there a direct ship from Dubai to Gdynia?
Confirm the current carrier itinerary for your sailing. Connections through northern European hubs are available, but the quotation should identify every transfer and the final Gdynia terminal.
Can Gdynia handle heavy project cargo?
Yes. BCT runs a dedicated breakbulk berth for ships up to 195 m and can lift single units up to 250 tonnes and 70 m long.
Is the Port of Gdynia open all year?
Yes. The port works 24 hours a day in three shifts, has no tides and is sheltered by the Hel Peninsula. Terminal gates have their own weekly schedules and holiday arrangements; confirm the collection window separately.
Can you handle shipping from Gdynia to Dubai?
Yes. We book the space from Gdynia to Jebel Ali, Khalifa Port or Sharjah, file the Dubai Customs declaration and arrange the applicable customs duty and import VAT, with rates and accounting treatment confirmed for the goods and importer. The shipper or its Polish agent handles the export declaration in AES at origin.
Get a quote for Port of Gdynia shipping
Send us your cargo details and we will come back with a routing and a price for shipping to Gdynia, including the hub and the terminal. Use our freight rate inquiry form, or contact our team to talk through a DG, reefer or project shipment. You can also read more about our Dubai freight forwarding team and our sea freight service.
Sources
- BCT: current working hours and holiday exceptions
- Polish tax authority: VAT rates
- Port authority: Logistics Centre intermodal project
- IMO: IMDG requirements
- Port of Gdynia Authority: Basic data (quays, area, entrance, pilotage, towage, hours)
- Port of Gdynia Authority: General port information
- Port of Gdynia Authority: Statistics 2015 to 2023
- Port of Gdynia Authority: 1 million TEU in 2025
- Port of Gdynia Authority: First half 2026 results
- Port of Gdynia Authority: Helskie Quay commissioned
- Port of Gdynia Authority: MSC Venice call, July 2026
- Port of Gdynia Authority: MEDLOG cold store agreement
- Port of Gdynia Authority: Rail access expansion
- Port of Gdynia Authority: Terminals
- Baltic Container Terminal: Terminal data (quays, cranes, rail, storage)
- Baltic Container Terminal: General cargo and project cargo
- Baltic Container Terminal: Reefer containers
- Baltic Container Terminal: Shipping services
- Baltic Container Terminal: Customs clearance
- Baltic Container Terminal: Inspections
- Baltic Container Terminal: Temporary storage facility
- Baltic Container Terminal: Rail
- Baltic Container Terminal: Regulations and procedures (IMDG instruction)
- ICTSI: Baltic Container Terminal
- Gdynia Container Terminal: Infrastructure
- Gdynia Container Terminal: Handling equipment
- Gdynia Container Terminal: Shipping services
- Gdynia Container Terminal: Customs clearance
- Gdynia Container Terminal: Home (services, heavy lifts)
- Celna24: Port of Gdynia (customs office codes, terminal hours)
- Wikipedia: Port of Gdynia (UN/LOCODE)
- Greencarrier Consolidators: Gdynia to Jebel Ali service (2024)
- European Commission: ICS2 live for maritime transport
- European Commission: EU Customs Tariff (TARIC)
- Your Europe: VAT rates in EU countries
- European Commission: What is exportation? (export declaration in AES, office of export and office of exit)
- PUESC (Polish customs and tax platform): Export of goods (AES)
- Dubai Customs: Submit customs declaration (invoice, packing list, certificate of origin, permits for restricted goods)
- Dubai Customs: FAQ (duty 5% of CIF value, 50% alcohol, 100% cigarettes)
- UAE Government portal: Clearing the customs and paying customs duty (5% of CIF)
- UAE Federal Tax Authority: VAT (5% rate)
Reviewed: 16 November 2026
