Port of Corpus Christi shipping is mostly energy, bulk and project cargo: crude oil, LNG, petroleum, dry bulk, wind turbine parts, steel pipe and heavy lifts. The port moved 203.4 million tons in 2025 and now has a 54 ft channel, but it is not a container port today, so containers for South Texas usually go through Houston. This guide covers the cargo docks, free time and dangerous goods rules, shipping from Dubai to Corpus Christi, and shipping from Corpus Christi to Dubai.
Port of Corpus Christi at a glance
| Item | Detail |
|---|---|
| Port authority | Port of Corpus Christi Authority, a political subdivision of the State of Texas with a seven-member commission |
| UN/LOCODE | USCRP |
| Location | Corpus Christi, Texas, on the western Gulf of Mexico |
| Total cargo 2025 | 203,380,240 tons (206,469,126 tons in 2024) |
| Breakbulk 2025 | 321,674 tons, up from 251,748 tons in 2024 |
| Channel | 54 ft MLLW and 530 ft wide, completed in 2025 |
| Multi-purpose cargo docks | Five (Docks 8, 9, 10, 14 and 15), drafts 34 to 45 ft |
| Open and covered storage | Over 120 acres open storage on the Northside, a 76-acre yard on the Southside, about 300,000 sq ft covered |
| Rail | BNSF, CPKC and Union Pacific through the Texas Coastal Bend Railroad |
| Highways | I-37, I-69 and US 181 |
| Container terminal | None in operation; a DP World terminal is under negotiation |
| Foreign-trade zone | FTZ No. 122 |
| Port tariff | Tariff 200, effective 17 March 2026 |
What is the Port of Corpus Christi and what does it move?
The Port of Corpus Christi Authority runs public docks along the Corpus Christi Ship Channel and the Inner Harbor, and it governs a channel lined with private oil, LNG and industrial terminals. The port opened in 1926 with cotton as its first export. Oil took over about ten years later and has led ever since.
The port's own December 2025 report shows how much the mix leans to energy:
| Commodity group | 2025 tons | 2024 tons |
|---|---|---|
| Crude oil | 127,436,981 | 130,487,632 |
| Petroleum | 62,453,245 | 60,267,804 |
| Dry bulk | 8,129,764 | 8,398,566 |
| Chemical | 3,139,091 | 3,453,378 |
| Bulk grain | 1,432,517 | 3,115,075 |
| Liquid bulk | 466,969 | 494,922 |
| Breakbulk | 321,674 | 251,748 |
Breakbulk is a small slice by weight, but it is the part a UAE shipper uses most: about 201,700 tons of it came in and 120,000 tons went out in 2025. The port then moved a record 110.3 million tons in the first half of 2026.
The authority describes itself as the largest US port by total revenue tonnage, and in 2022 the nation's number one crude export gateway and number two for LNG. That energy base explains the cargo docks, rail yards and laydown space that also serve project cargo.
Can you ship containers to Corpus Christi?
Not on a regular liner service today. In September 2026 the port's chief strategy officer described Corpus Christi as not yet a container port, while announcing a lease option with DP World for a future container terminal. The terminal could eventually handle about 1 million TEU a year, and the port bought about 2,000 acres 8 to 10 miles south of the Inner Harbor for an inland port to support it. No opening date has been published.
The cargo docks do handle containers alongside breakbulk, for example on project shipments or Ro-Ro vessels. For ordinary FCL and LCL, the practical answer is Port Houston, which handles 97% of Texas container traffic and 75% of US Gulf Coast container traffic. The box then goes south by truck or rail.
| Your cargo | Best discharge port | Why |
|---|---|---|
| FCL or LCL for Corpus Christi or South Texas | Houston (Bayport or Barbours Cut) | Regular container services; truck or rail onward |
| Wind parts, heavy lifts, steel pipe for South Texas sites | Corpus Christi cargo docks | Breakbulk berths, laydown and rail next to the projects |
| Dry bulk for South Texas | Corpus Christi Bulk Terminal or a private dock | Bulk loaders, rail and open storage |
| Containers once the DP World terminal opens | Check again | Not in operation yet |
The 54 ft channel and where the docks sit
The Corpus Christi Ship Channel Improvement Project took the channel from 47 ft to 54 ft MLLW and widened it to 530 ft. The port announced completion in June 2025 and calls it the deepest and widest draft channel on the Gulf Coast. The project also added barge shelves so vessels and barges can pass in two-way traffic.
The public facilities sit a long way inside. The port's own channel chart gives these distances from the sea buoy station in the Gulf:
| From station 330+00 in the Gulf to | Nautical miles |
|---|---|
| Port Aransas inner basin | 6.2 |
| La Quinta Junction | 14.8 |
| Harbor Bridge | 24.4 |
| Bulk Terminal | 27.8 |
| West end of the Inner Harbor | 31.7 |
Pilotage is compulsory. Your carrier plans the draught and the pilot, but the dockside draft, not the channel, is the real limit. The cargo docks range from 34 to 45 ft.
Breakbulk and project cargo at the Port of Corpus Christi
This is the reason to ship to Corpus Christi from the UAE. The port lists five multi-purpose cargo docks for breakbulk, wind turbine components, steel pipe, containers, Ro-Ro and heavy-lift project cargo.
Cargo docks and equipment
| Dock | Side | What the port lists |
|---|---|---|
| Cargo Dock 8 | Southside | Liebherr LHM 550 multi-purpose mobile harbor crane (commissioned Q4 2023), double rail tracks; described as the strongest open wharf on the Gulf Coast |
| Cargo Dock 9 | Northside | Three shipside rail tracks, warehouse, 48 ft canopy over double tracks for weather-sensitive transfers |
| Cargo Dock 10 | Northside | Double shipside tracks, warehouse; Ro-Ro ramp next to Docks 9 and 10 |
| Cargo Docks 14 and 15 | Southside | Double rail tracks, dockside covered storage, bagging lines near Dock 15 |
The Ro-Ro ramp takes bow or stern ramp vessels, and a seven-acre surfaced pad sits next to Docks 9 and 10. Direct ship-to-rail discharge is possible at several docks.
Laydown and storage
| Area | Open storage | Covered storage |
|---|---|---|
| Northside | Over 120 acres | 122,000 sq ft |
| Southside | 76-acre yard | 173,000 sq ft |
| Rincon West Yard (near Dock 9) | 25 acres built for heavy haul and breakbulk | None listed |
The port lists seven near-dock laydown yards in all. Under Tariff 200, long-term open storage can be arranged at $2,500 per acre per month, subject to request and space.

Wind energy cargo
The port calls itself the nation's largest port for wind energy components on the Gulf Coast. It handled 2,603 large components in 2015 and 2,875 in 2016, mostly blades and tower sections, and its Rincon West Yard took its first nacelles, hubs, drive trains and blades in July 2018. If you ship turbine parts, towers or transformers from the region, this is the port set up for them.
Getting heavy cargo out of the port
The port connects to I-37 and US 181 for legal-limit and oversize or overweight project cargo, and the Joe Fulton International Trade Corridor gives direct access to I-37. For rail, the Nueces River Rail Yard has eight tracks of 8,500 ft each, and the Southside has more than 20,000 ft of track plus the Al Speight Rail Yard. The port also has direct access to the Intracoastal Waterway for barge moves.
How we plan project cargo from Dubai to Corpus Christi
- Collect drawings, dimensions, weights and centre of gravity for every piece.
- Choose breakbulk or heavy-lift tonnage that can call at a Corpus Christi cargo dock, or flat racks into Houston if the pieces fit.
- Check the dockside draft and the crane or ship's gear for each lift with the carrier and the stevedore.
- Give the consignee's trucker or rail planner the dimensions so the Texas permits and route are ready.
- Make sure the ISF and the US entry are filed in time.
- Plan delivery inside the 30-day free time on the dock.
Our break bulk and project cargo team handles the UAE side. For the detail behind each step, read our project cargo logistics process and our heavy-lift shipping guide. If a piece is near the limit for a flat rack, our guide to flat rack, open top and breakbulk options helps you choose.
Dry bulk shipping at the public bulk terminal
The Port of Corpus Christi Bulk Terminal covers 200 acres on the north side of the Inner Harbor and serves coal, ores, aggregates, pig iron, petroleum coke, sulfur and other dry bulk.
| Dock | Draft | Equipment |
|---|---|---|
| Bulk Dock 1 | 34 ft | Rail-mounted Liebherr LPS 550 crane, 48 m outreach, 144-ton capacity |
| Bulk Dock 2 | 45 ft | Radial ship loader, up to 1,500 tons per hour |
All three Class I railroads serve the terminal, and its docks take unit trains. The crane at Bulk Dock 1 can work imports, while the radial ship loader at Bulk Dock 2 is built for loading exports. Our bulk cargo service covers the UAE end of bulk moves.
Free time and charges on the public docks
Tariff 200, effective 17 March 2026, sets the rules on the authority's public wharves. The key points for breakbulk and project cargo:
| Item | Rule |
|---|---|
| Free time, all cargo except dry bulk | 30 days, starting the first 07:00 after the cargo is placed on the wharf |
| Weekends and holidays | Included when free time is counted |
| On-dock covered storage after free time | $0.75 per sq ft per 30-day period |
| Off-dock covered storage after free time | $0.50 per sq ft per 30-day period |
| Long-term open storage | $2,500 per acre per month, on request |
| Security surcharge | 10% on all wharfage and dockage |
Thirty calendar days is generous next to container terminals, but permit delays on oversized pieces can still use it up. Shipping line demurrage on any containers is separate. Our article on demurrage and detention explains the difference.
Dangerous goods and explosives at Corpus Christi
Tariff 200 accepts hazardous materials on the public facilities only if they and the way they are handled meet US Coast Guard and Department of Transportation rules. The Harbormaster can issue directives and can refuse cargo that poses undue risk. A vessel master must tell the Harbormaster on docking about any hazardous cargo on board, with quantity and location.
Explosives have extra limits. Without a Harbormaster permit, no vessel other than a US Government vessel may enter the Inner Harbor with more than 1,000 pounds net explosive content on board. The user must file the Coast Guard permit with the Harbormaster, and explosives for export may not enter a terminal before the vessel's sailing date.
For any DG booking, you need the UN number, proper shipping name, class and packing group, an SDS, a signed DG declaration, UN-approved packaging and carrier acceptance. Our dangerous goods shipping team checks these against the carrier's rules before you book.
Shipping from Dubai to Corpus Christi: routes and transit
We found no published liner schedule from the UAE to Corpus Christi. Breakbulk and project cargo moves on chartered or semi-liner tonnage, so the route and the time depend on the vessel. Containers move on a Houston service and then by truck or rail.
[AMIR-FACT: our real transit days and the vessel type or carrier we use for breakbulk or project cargo from Jebel Ali or Khalifa Port to Corpus Christi, or confirmation that we route this cargo via Houston]
Plan backwards from the site date: vessel fixture, cargo readiness at the UAE port, discharge window at the Corpus Christi dock, then permits and trucks.
US customs at the Port of Corpus Christi: the short version
US customs rules are the same here as at any US port. CBP clears the goods, and the US importer of record files, usually through a licensed customs broker. Our Houston guide covers the US steps in more detail.
- ISF. Qualifying break bulk cargo files the ISF at least 24 hours before arrival in the US. Containerised cargo, or break bulk that does not qualify, files at least 24 hours before loading at the foreign port. Bulk cargo exempt from the carrier's pre-lading declaration is also exempt from the ISF.
- Bond. Goods are generally not released at entry without a single-entry or continuous bond on file.
- Duty. The rate comes from the HTS code. Check the current tariff schedule for your code.
- Fees. Merchandise processing fee of 0.3464% of value (minimum $34.58, maximum $670.86 from 1 October 2026) and harbor maintenance fee of 0.125% of value on sea cargo.
FTZ No. 122 can help a project buyer. Its magnet site covers all the port-run laydown yards and warehouses along the Inner Harbor, and new sites can be designated across a seven-county service area. Duty is deferred until the goods enter the US market.

How to ship breakbulk from Dubai to Corpus Christi: step by step
We book space with carriers, prepare documents, arrange origin trucking and UAE export clearance, plan stowage for breakbulk and DG, and work with your US importer's customs broker.
- Send us the cargo list: pieces, dimensions, weights, HTS codes, and the US importer and broker.
- We decide with you: breakbulk to a Corpus Christi cargo dock, or containers and flat racks through Houston.
- We fix space on a suitable vessel from Jebel Ali Port or another UAE port, and confirm the discharge dock and stevedore.
- We deliver the cargo to the UAE port, arrange lashing and the Dubai Customs export declaration.
- The US filer sends the ISF on time, using the data and packing list we prepare.
- We check the bill of lading against the invoice and packing list, then release it.
- The broker files the entry before arrival, and the consignee books trucks or rail inside the 30-day free time.
How to ship from Corpus Christi to Dubai
We also bring cargo the other way, from South Texas to Jebel Ali, Khalifa Port or Sharjah. Shipping from Corpus Christi to Dubai splits the same way as the import lane. Breakbulk, steel pipe, machinery and project pieces can load at a Corpus Christi cargo dock; in 2025 about 120,000 tons of breakbulk went out over the port's docks. Dry bulk can load at Bulk Dock 2, whose radial loader handles up to 1,500 tons per hour. Containers go out through a Houston service.
[AMIR-FACT: one real export we handled from Corpus Christi or South Texas to the UAE (cargo, port of loading, vessel type, transit days), or confirmation that we have not yet handled one]
The US export side
We book space with the carrier, or fix breakbulk tonnage, and send the booking and cut-offs to the US shipper. The export paperwork in Texas is handled by the shipper or its origin agent:
- EEI filing. The US exporter or its agent files Electronic Export Information at least 24 hours before the cargo is loaded on the vessel. It is not needed when the value per Schedule B number to one consignee is $2,500 or less.
- Dock free time. Outbound cargo on the public wharves gets the same 30 days under Tariff 200, so pieces can be staged ahead of the vessel.
- Explosives for export may not enter a terminal before the vessel's sailing date.
- Drawings, weights and lifting points for each piece go to us early so we can confirm stowage with the carrier.
The UAE import side
On arrival we file the import declaration with Dubai Customs, which asks for the invoice, packing list, certificate of origin and any permit for restricted goods. Customs duty in Dubai is 5% of the CIF value for most goods. We then arrange the delivery order, port release and the trailer to your site, including oversized moves within the UAE. Our Jebel Ali port shipping guide covers the UAE steps.
- Send us the supplier's address in Texas, the cargo list and the Incoterm.
- We decide with you: breakbulk from a Corpus Christi dock, or containers from Houston.
- We book the vessel and arrange the pickup through the carrier or the supplier's trucker.
- The shipper or its agent files the EEI and delivers the cargo before the cut-off.
- We check the bill of lading, then clear the cargo with Dubai Customs and deliver it in the UAE.
Checklist before you ship to Corpus Christi
- Discharge port decided: Corpus Christi cargo dock for breakbulk, Houston for containers.
- US importer, broker and customs bond confirmed.
- HTS codes agreed and the current duty checked.
- Piece-by-piece packing list with dimensions, weights and centre of gravity.
- Dockside draft and lifting equipment checked for the heaviest piece.
- Laydown or open storage booked if pieces will wait for a site window.
- Oversize road permits or rail plan ready before arrival.
- For DG: full documents, carrier acceptance and any Harbormaster requirements met.
Common mistakes when shipping to Corpus Christi
- Booking a container service to Corpus Christi. There is no container terminal in operation yet; book to Houston.
- Planning on the 54 ft channel depth. The cargo docks have drafts of 34 to 45 ft.
- Filing the breakbulk ISF to the wrong deadline. Containers and non-qualifying break bulk file before loading.
- Forgetting that weekends count. The 30-day dock free time runs on calendar days.
- Bringing explosives for export into the terminal before the sailing date. The tariff does not allow it.
- Leaving road permits until the cargo lands. Oversized pieces then sit on the dock and in storage.
Frequently asked questions
Does the Port of Corpus Christi have a container terminal?
Not in operation. The port signed a lease option with DP World for a future terminal of about 1 million TEU a year, but for now containers for South Texas usually go through Port Houston.
How deep is the channel at Corpus Christi?
The channel is 54 ft MLLW and 530 ft wide since the improvement project was completed in 2025. The public cargo docks have drafts of 34 to 45 ft.
What cargo does the Port of Corpus Christi handle?
Mainly crude oil, petroleum and LNG, plus dry bulk, chemicals, grain and breakbulk. Its cargo docks handle wind turbine components, steel pipe, Ro-Ro and heavy-lift project cargo.
How much free time do I get on the Corpus Christi docks?
Tariff 200 gives 30 days for all cargo except dry bulk, starting the first 07:00 after the cargo is placed on the wharf. Saturdays, Sundays and holidays are counted.
Can I ship dangerous goods through Corpus Christi?
Yes, if the cargo and its handling meet US Coast Guard and DOT rules. The Harbormaster can refuse risky cargo, and explosives above 1,000 pounds net on a vessel need a permit.
Which railroads serve the Port of Corpus Christi?
BNSF, CPKC and Union Pacific, through the Texas Coastal Bend Railroad. Several cargo docks allow direct discharge from ship to rail.
Can I ship cargo from Corpus Christi to Dubai?
Yes. Breakbulk, project pieces and dry bulk can load at the Corpus Christi docks, while containers usually leave through Houston. We book the vessel, and the US shipper or its agent files the export data before loading.
Is there a foreign-trade zone at the port?
Yes, FTZ No. 122. Its magnet site covers the port's laydown yards and warehouses along the Inner Harbor, and duty is deferred until goods enter the US market.
Get a quote for Port of Corpus Christi shipping
Send us your cargo list and we will come back with a routing and a price, through Corpus Christi or through Houston. Use our freight rate inquiry form, or contact our team to talk through a wind, heavy-lift or DG shipment first. You can also read more about our Dubai freight forwarding team.
Sources
- Port of Corpus Christi: home page (54 ft channel, cargo types, contact)
- Port of Corpus Christi: 2024 general brochure (commission, ranking, channel project, channel distances, bulk docks)
- Port of Corpus Christi: Cargo tonnage by commodity, December 2025
- Port of Corpus Christi: Breakbulk cargo (five cargo docks, drafts, storage, cranes, rail, FTZ 122)
- Port of Corpus Christi: Cargo docks (Docks 8, 9, 10, 14, 15)
- Port of Corpus Christi: Wind energy and project cargo (laydown yards, rail yard, highways)
- Port of Corpus Christi: Dry bulk and Bulk Terminal
- Port of Corpus Christi: Rincon West laydown yard (July 2018)
- Port of Corpus Christi: Wind turbine cargo keeps growing (December 2017)
- Port of Corpus Christi: Foreign-Trade Zone 122 benefits
- Port of Corpus Christi: Tariffs page
- Port of Corpus Christi Authority Tariff 200, effective 17 March 2026 (free time, storage, hazardous materials, explosives)
- Maritime Logistics Professional: Port of Corpus Christi completes deepest, widest channel on Gulf Coast (June 2025)
- FreightWaves: DP World plots US port comeback with Corpus Christi container terminal (2026)
- Port Houston: Port statistics (Texas and Gulf Coast container share)
- Wikipedia: Port of Corpus Christi (1926 opening, history, governance)
- MarineLink: Corpus Christi port directory (compulsory pilotage)
- Gateway Lines: Port of Corpus Christi (UN/LOCODE USCRP)
- 15 CFR 30.4: EEI filing timeline
- 15 CFR 30.37: EEI exemptions ($2,500 per Schedule B number)
- Dubai Customs: Submit customs declaration (documents)
- UAE Government portal: Customs duty (5% of CIF in Dubai)
- 19 CFR 149.2: ISF time of transmission
- 19 CFR 149.4: ISF for bulk and break bulk cargo
- 19 CFR 142.4: Bond required at time of entry
- Federal Register, CBP Dec. 26-14: Customs user fees for fiscal year 2027
- 19 CFR 24.24: Harbor maintenance fee
Reviewed: 10 November 2026