Skip to content

Port of Szczecin shipping: Szczecin-Swinoujscie terminals, customs and how to ship from Dubai

Szczecin river terminal — reference-grounded illustration
Szczecin river terminal — reference-grounded illustration. Generated from photographic references; not an event photograph.

Port of Szczecin shipping covers two ports under one authority: Szczecin, 68 km inland on the Oder, and Swinoujscie, directly on the Baltic coast. Together they form the Szczecin-Swinoujscie port complex, strong in bulk, steel, project and general cargo, with a smaller container trade fed from Hamburg and Bremerhaven. This guide covers the terminals, draught limits, cargo types, customs points specific to Szczecin and how we move cargo there from Dubai. We ship both from Dubai to Szczecin and from Szczecin to Dubai.

Port of Szczecin at a glance

ItemDetail
Port authoritySzczecin and Swinoujscie Seaports Authority (ZMPSiS)
UN/LOCODEPLSZZ (Szczecin), PLSWI (Swinoujscie)
LocationNorth-west Poland, the westernmost Polish ports; Szczecin is 140 km from Berlin
Distance from the seaSzczecin about 68 km inland, about 4 hours by waterway from Swinoujscie; Swinoujscie on the sea
Maximum ship size, Szczecin9.15 m draught, 215 m length
Maximum ship size, Swinoujscie13.5 m draught, 270 m length
Container terminalDB Port Szczecin; container ships can also be worked at OT Port Swinoujscie
Container capacity, Szczecin150,000 TEU a year, about 90,000 TEU handled annually
Feeder linksUnifeeder, weekly, including Hamburg and Bremerhaven
Whole complex, 202335.3 million tonnes, the 6th largest port complex on the Baltic
Main cargoCoal, ore, fertilizers, grain, chemicals, steel, granite, project and general cargo, containers
Free zonesDuty Free Zone areas at DB Port Szczecin and Euro-Terminal Swinoujscie
Import VAT (Poland)23% standard, 8% and 5% reduced
Szczecin to DubaiAlso handled: EU export filing by the shipper or its agent, UAE clearance at Jebel Ali, Khalifa Port or Sharjah by us

Szczecin and Swinoujscie: one port, two very different sites

The single most useful fact about this port is that its two halves take very different ships. Szczecin sits on the Oder and Regalica rivers, about 68 km from the sea. The port authority lists a maximum draught of 9.15 m and length of 215 m there. Swinoujscie is on the open coast and takes ships up to 13.5 m draught and 270 m long.

The waterway between them was dredged to 12.5 m, a project of about PLN 1.4 billion that MarinePoland reports was finished in 2022. Quays in Szczecin are being adapted to use that depth, and the port's container page says works are under way so DB Port Szczecin can serve ships with an 11 m draught. Until your terminal confirms otherwise, plan on the published 9.15 m limit for Szczecin.

PointSzczecinSwinoujscie
PositionRiver port, 68 km inlandSea port on the Baltic coast
Max draught9.15 m13.5 m
Max length215 m270 m
StrengthsContainers, steel, granite, general cargo, project cargo, cold storesLarge bulk ships, ferries, deep-draught general and project cargo
Main operatorsDB Port Szczecin, Bulk Cargo - Port Szczecin, Fast TerminalsOT Port Swinoujscie, Euro-Terminal, Baltchem

Decision rule: cargo on a feeder container ship or a mid-size general cargo ship usually goes to Szczecin itself. A large bulk carrier or a deep-draught breakbulk ship goes to Swinoujscie.

Container shipping through the port of Szczecin

Containers are a small part of this port's business. The port authority says DB Port Szczecin handles about 90,000 TEU a year against a capacity of 150,000 TEU. The port's listed container services are all feeders, so plan on a relay.

DB Port Szczecin container terminal

FeatureFigure
Annual capacity150,000 TEU
Container storage4,000 TEU
Feeder quays3, total length 1,000 m
Maximum draught9.15 m (works under way for 11 m)
Reefer plugs157
Cranes2 STS cranes, 2 mobile harbour cranes of 100 t, 4 RTG cranes
Ro-ro ramps2
Other equipment3 reach stackers, 22 tractor and trailer sets

In Swinoujscie, OT Port Swinoujscie can also work container ships at the Hutnikow quay, which is 328.7 m long and takes ships with a 13.2 m draught. Its STS crane lifts 68 t at 40 moves an hour.

Feeder links: how Gulf containers reach Szczecin

The port authority lists weekly Unifeeder services, with Unifeeder Polska as agent, linking Szczecin with these ports:

  • Hamburg and Bremerhaven in Germany
  • Lubeck in Germany
  • Copenhagen in Denmark
  • Oslo in Norway
  • Halmstad in Sweden
  • Immingham in Great Britain

For a box from Jebel Ali, the usual path is a main-line ship to Hamburg or Bremerhaven and a feeder from there to Szczecin. The feeder sails weekly, so a missed connection at the hub costs about a week. Book on a through bill of lading to Szczecin if the carrier offers it, so the relay is the carrier's job.

[AMIR-FACT: our real transit time from Jebel Ali to Szczecin, the hub port used and the carriers we normally book on this lane]

FCL or LCL to Szczecin?

FCL is the normal choice for Szczecin. LCL cargo for western Poland is often unpacked at a consolidator's warehouse elsewhere, then trucked. If your LCL quote says "Szczecin", ask where the container freight station is. Our guide to FCL vs LCL costs helps you find the break-even point, and our sea freight service covers both.

Another option some consignees use: land the box at Hamburg and truck it to Szczecin or Berlin. Szczecin is 140 km from Berlin, and the A11 and A20 motorways link the ports to the European road network. Compare the feeder cost and time with a truck from the hub before you book.

Breakbulk, project and heavy cargo at Szczecin-Swinoujscie

General cargo is where this port is strongest. The port authority describes Szczecin as specialised in containers, steel and granite, and Wikipedia calls it Poland's largest transshipment centre for granite blocks. Several terminals take project and oversized pieces.

TerminalSiteWhat it offers
DB Port SzczecinSzczecin6 quays, nearly 2,500 m, drafts 7.7 to 9.15 m; 18 electric harbour cranes, 2 Gottwald mobile cranes of 100 t; Duty Free Zone
Fast TerminalsSzczecinProject, oversized and general cargo; 4 quays, nearly 690 m, drafts 6.6 to 8.4 m; 20,000 sq m warehouse, 25,000 sq m open storage; mobile cranes of 16 to 40 t
OT Port SwinoujscieSwinoujscieGeneral, bulk, project and oversized cargo; 4 berths, 1,190 m, drafts 12.10 to 13.50 m
Euro-TerminalSwinoujscieGeneral cargo, Duty Free Zone; 6 quays, 2,150 m, max draft 8.30 m; 3 Liebherr mobile cranes of 40 to 84 t; 27,000 sq m warehousing, 300,000 sq m open yards
Industrial pressure vessels secured on deck — generic project cargo illustration
Industrial pressure vessels secured on deck — generic project cargo illustration. Generated from photographic references; not an event photograph.

How we plan project cargo for Szczecin:

  1. Collect drawings, dimensions, weights and centre of gravity for each piece.
  2. Check whether each piece fits a 40ft flat rack. If it does, it can go on the container route via a hub and the feeder.
  3. If it does not, look for a breakbulk or heavy-lift sailing, and match its draught to Szczecin (9.15 m) or Swinoujscie (13.5 m).
  4. Match the heaviest lift to the terminal's crane capacity, or plan for the ship's own gear.
  5. Line up the consignee's road permits in Poland, or a barge on the Oder if the site is on the river.

Heavy pieces need extra care at a river port with limited draught. See our heavy-lift shipping guide and our break bulk and project cargo service.

Bulk, liquid and cold cargo

Bulk is the port's biggest business. The port authority calls it a service leader in dry and liquid bulk.

OperatorSiteCargo and capacity
Bulk Cargo - Port SzczecinSzczecinAbout 4 to 5 million t a year; 11 quays, 3,364 m; 70,000 sq m warehouses, 500,000 sq m open storage, 18,000 cbm tanks
OT Port SwinoujscieSwinoujscieAbout 4 to 6 million t a year; 4 quays, 1,190 m
BaltchemSzczecin and SwinoujscieFertilizers, vegetable oil, fuels, methanol, ethanol, other chemicals
FosfanSzczecinBulk materials, aggregates, liquid chemicals
Alfa TerminalSzczecinBulk cargo and liquid chemicals, mainly methanol
Centrum Logistyczne GryfSzczecinFrozen sea products, cold store for 13,000 t
Chlodnia SzczecinskaSzczecinCold store for 13,000 t, storage at -20 C, freezing at -30 C

For bulk cargo from the UAE, the terminal choice depends on the ship size. A ship over 9.15 m draught goes to Swinoujscie. Our bulk cargo service covers charter planning and discharge at the receiving terminal.

Dangerous goods through the port of Szczecin

The port authority says both Szczecin and Swinoujscie are prepared to accept dangerous goods, with handling magazines and a storage place for dangerous goods containers. It has transport plans for high-risk goods at four facilities: Szczecin General Cargo, Szczecin Bulk Cargo, the commercial port in Swinoujscie and the ferry terminal in Swinoujscie. Baltchem, Fosfan and Alfa handle liquid chemicals at their own terminals.

For a DG container from Dubai, the main risk is the route, not the port. Your box crosses at least two carriers' rules: the main-line carrier to the hub and the feeder from the hub to Szczecin. Have these ready before you book:

  • UN number, proper shipping name, class and packing group.
  • Safety Data Sheet for each product.
  • Signed Dangerous Goods Declaration and container packing certificate.
  • UN-approved packaging, labels and placards.
  • Acceptance from the main-line carrier, the hub terminal and the feeder operator.

Our dangerous goods shipping team gets acceptance for every leg before you commit to a sailing.

Customs at the port of Szczecin: what is specific to this port

Poland's import rules are the same at every port, and our Gdansk guide covers them in full. Here is the short version, then what is different at Szczecin.

The short customs summary

RuleWhat it means for a Dubai shipment
Entry summary declaration (ICS2)Live for sea cargo since 3 June 2024. The carrier files the ENS; forwarders issuing house bills file house-level data.
Where the ENS is filedAt the first EU port. If your box is relayed at Hamburg or Bremerhaven, that is in Germany, not Poland.
EORI numberThe Polish importer needs one for the import declaration
Customs dutyThe EU rate in TARIC for your HS code and origin
Import VAT23% standard, 8% and 5% for listed goods

Transit from the German hub

Because most containers for Szczecin are relayed at a German port, you have a choice to make. The goods can be released into free circulation in Germany and then move to Poland as EU goods. Or they can stay under customs control at the hub, travel on the feeder or by truck under transit, and be cleared in Szczecin. Polish import VAT then applies in Poland. The consignee's Polish agent should decide this before the box leaves Jebel Ali, because it changes who files what at the hub.

The customs branch at the port

Szczecin cargo falls under the West Pomeranian Customs and Tax Office in Szczecin (Zachodniopomorski Urzad Celno-Skarbowy). Its maritime branch is the Oddzial Celny Nabrzeze Lasztownia, named after the Lasztownia quay. Confirm the current branch code with the consignee's customs agent before you file a transit declaration.

Duty Free Zone areas

The port authority lists Duty Free Zone areas at DB Port Szczecin and at Euro-Terminal in Swinoujscie. Goods stored there have not yet been released into free circulation, so duty and VAT wait until release. This suits goods for which the final buyer or market is not yet fixed. Ask the terminal about storage terms first.

Sample shipping documents: bill of lading, invoice, packing list and certificate of origin
Illustrative sample shipping documents. Generated from photographic references; not actual shipment records.

Moving cargo inland from Szczecin

Szczecin's location shapes its hinterland. The port authority lists these links:

  • Road. The A11 and A20 motorways connect to the European network, and national road No. 3 (E65) runs south to southern Poland, the Czech Republic and Slovakia.
  • Rail. The Oder main line links both ports with industrial centres in western and southern Poland. About PLN 1.5 billion has gone into port rail, and in April 2025 the port signed an agreement to build a new hub for moving containers between ship and train.
  • Inland waterway. The port authority describes Szczecin as the only Polish sea port for inland waterway transport, with barges reaching Berlin and Brandenburg.

The main hinterland is western and south-western Poland (including Poznan, Wroclaw and Upper Silesia), eastern Germany (Berlin, Brandenburg and Saxony), and the Czech Republic and Slovakia.

What about the deepwater container terminal?

The Seaports Authority has been preparing a deepwater container terminal in Swinoujscie. Its 2021 articles describe up to 2 million TEU a year and the largest container ships that can enter the Baltic. Check its current status before you plan around it. Today, containers for this port still arrive on feeders.

How to ship to the port of Szczecin from Dubai: step by step

This is how we handle a typical FCL export from the UAE to Szczecin. We book space and handle the UAE side. A Polish customs agent, usually chosen by the consignee, handles clearance in Poland.

  1. Send us the cargo details. Commodity, HS code, weight, volume or dimensions, the consignee's town and the Incoterm.
  2. We pick the routing. Main-line carrier, hub port and feeder to Szczecin, or a hub port and truck. For bulk or breakbulk, we match the ship's draught to Szczecin or Swinoujscie.
  3. Book space. For DG, reefer or out-of-gauge cargo we get acceptance for every leg first.
  4. Pick up and stuff the container. We arrange the empty box, trucking from your site and the seal.
  5. Export clearance in the UAE. We file the export or re-export declaration and deliver the box to Jebel Ali before the cut-off. Our Jebel Ali port shipping guide explains that side.
  6. Send the ENS data. Precise goods description, HS codes, shipper and consignee, so the carrier can file before loading.
  7. Agree the customs plan. The consignee's agent decides: clear at the German hub, or move under transit and clear in Szczecin.
  8. Release the bill of lading. We check the draft and release it as your payment terms require.
  9. Delivery. The feeder discharges at DB Port Szczecin, the agent clears the goods, and the box goes to the consignee by truck, rail or barge.

How to ship from the port of Szczecin to Dubai

We also handle the other direction: shipping from Szczecin to Dubai, with arrival at Jebel Ali, Khalifa Port or Sharjah port. We book the space with the carrier and run the UAE side. The export papers at origin stay with the shipper or its Polish customs agent.

The Polish export side

  • The export declaration. EU rules require it to be lodged electronically through the Automated Export System (AES). The exporter or its declarant lodges it at the customs office responsible for where the exporter is established. In Poland the system is AES/ECS2, reached through the PUESC platform of the National Revenue Administration.
  • EORI. The European Commission says an EORI number is mandatory for all customs operations, export included, so the shipper needs one before it files.
  • Exit. The goods are presented at the customs office of exit, which checks them against the declaration and supervises their departure. For sea cargo on one transport contract to the Gulf, that can be the office where the carrier takes the goods over.
  • Licences. Any export licence is presented as part of the exit formalities, so the shipper's agent checks restrictions before booking.

The UAE import side

On arrival, the declaration goes to Dubai Customs with the commercial invoice, packing list, certificate of origin and any permit for restricted goods. The bill of lading is what the line needs before it issues the delivery order. Customs duty in Dubai is 5% of the CIF value for most goods, with 50% on alcohol and 100% on cigarettes. Import VAT is 5% of the customs value, which includes freight and insurance. A VAT-registered importer whose customs number is linked with the Federal Tax Authority accounts for that VAT on its VAT return instead of paying it at release.

  1. Send us the shipper's details in western Poland, the cargo, the HS code and the UAE delivery address.
  2. We book space on the feeder from DB Port Szczecin and the main-line ship from the hub, and send the cut-offs to the shipper.
  3. The shipper or its trucker delivers the box to the Szczecin terminal before the cut-off.
  4. The shipper or its Polish customs agent lodges the export declaration in AES with the EORI number.
  5. We check the draft bill of lading against the invoice and packing list before the carrier issues it.
  6. We file the Dubai Customs declaration before the ship arrives.
  7. We arrange payment of the duty and VAT, or the VAT deferral if you are VAT-registered, and collect the delivery order from the line.
  8. We truck the cargo to your site in the UAE and return the empty inside free time.

[AMIR-FACT: the carriers and hub we actually use from Szczecin to Jebel Ali, Khalifa Port or Sharjah, and our real port-to-port transit days in this direction]

Szczecin, Gdansk or Gdynia: which Polish port fits your cargo?

Your situationPort to look at firstWhy
Consignee in western Poland, Berlin or BrandenburgSzczecinClosest Polish port, river and road links to eastern Germany
Steel, granite, project or general cargo on a mid-size shipSzczecinSpecialist general cargo terminals
Large bulk ship over 9.15 m draughtSwinoujscie13.5 m draught at the coast
Containers for central or eastern PolandGdansk or GdyniaLarger container trade; compare them before you book

Checklist before you ship to Szczecin

  • Port confirmed: Szczecin (PLSZZ) or Swinoujscie (PLSWI), and the terminal.
  • Ship draught checked against 9.15 m for Szczecin or 13.5 m for Swinoujscie.
  • Hub port and feeder confirmed, ideally on a through bill of lading.
  • Customs plan agreed: clear at the German hub or transit to Szczecin.
  • HS code checked in TARIC, and the importer's EORI number confirmed.
  • Invoice, packing list and bill of lading match on weights, piece counts and consignee.
  • For DG: SDS, DG declaration, packaging and labels, and acceptance for every leg.
  • For project cargo: drawings, lifting points and crane capacity at the terminal.
  • Free time on the container agreed, including time lost at the hub.

Common mistakes on Szczecin shipments

  • Treating Szczecin and Swinoujscie as one berth. A ship that fits Swinoujscie may not reach Szczecin.
  • Booking to Hamburg without a plan for the last leg. The box then sits at the hub while someone arranges a feeder or truck.
  • No customs plan at the hub. The German terminal will not release a box until someone files the right declaration.
  • Getting DG acceptance from the main-line carrier only. The feeder operator can refuse the class.
  • Expecting a deep-sea ship at Szczecin. Containers arrive on feeders, so allow for the relay.
  • Letting free time run out at the hub. Our guide to demurrage and detention charges shows how fast the costs grow.

Frequently asked questions

What is the port code for Szczecin?

The UN/LOCODE for Szczecin is PLSZZ, and for Swinoujscie it is PLSWI. Use the code of the port where the cargo will actually be discharged.

Are Szczecin and Swinoujscie the same port?

They are two ports managed by one authority, the Szczecin and Swinoujscie Seaports Authority. Szczecin is 68 km inland on the Oder, and Swinoujscie is on the Baltic coast.

How deep is the port of Szczecin?

The port authority lists a maximum draught of 9.15 m and length of 215 m for Szczecin, and 13.5 m and 270 m for Swinoujscie. The waterway between them has been dredged to 12.5 m, and quays are being adapted.

Which terminal handles containers in Szczecin?

DB Port Szczecin runs the container terminal, with a capacity of 150,000 TEU a year and about 90,000 TEU handled annually. OT Port Swinoujscie can also work container ships.

Is there a direct ship from Dubai to Szczecin?

Container cargo reaches Szczecin on feeder ships, mainly via Hamburg and Bremerhaven, so expect a relay at a hub port. Bulk or breakbulk cargo can come on a direct charter if the ship fits the port.

Can you ship from Szczecin to Dubai?

Yes. The shipper or its Polish customs agent files the EU export declaration in AES. We book the feeder and main-line legs, clear the cargo with Dubai Customs and arrange payment of the 5% duty on most goods and the 5% import VAT.

Can Szczecin handle project and heavy cargo?

Yes. DB Port Szczecin has two 100 t mobile cranes, Fast Terminals handles project and oversized cargo, and Euro-Terminal in Swinoujscie has mobile cranes of up to 84 t. Larger pieces need a ship with its own gear.

What import VAT applies to cargo landed in Szczecin?

Poland's standard VAT rate is 23%, with reduced rates of 8% and 5% for listed goods. Customs duty comes from the EU tariff (TARIC) for your HS code.

Does the port of Szczecin have a free zone?

Yes. The port authority lists Duty Free Zone areas at DB Port Szczecin and at Euro-Terminal in Swinoujscie, where goods can be stored before release into free circulation.

Get a quote for port of Szczecin shipping

Send us your cargo details and the consignee's town, and we will come back with a routing and a price for shipping from Dubai to Szczecin or Swinoujscie. Use our freight rate inquiry form, or contact our team to talk through a bulk, project or DG shipment first.

Sources

Reviewed: 10 November 2026

Tell us what you are shipping.

Reply within one working day, Monday to Friday, 8:00 to 16:00 Dubai time.